Master Flowmeter Calibration

Hello, I'm new in the forum and I have this question: is it suitable to perform a master flow meter calibration with water using a prover or seraphin if the intended use is to certify tankers flow meters to dispense fuel to aircrafts? Many thanks!

Oil Control Piston Rings for Ported Cylinders

I need to find piston rings that are the same diameter for both a 2 stroke AND a 4 stroke that have oil control piston rings that can tolerate and operate properly in a ported cylinder without the oil control ring deforming, distorting and extruding into the port and breaking as it travels past the

Generator Modes of Operation

Hi,

I am using ETAP for system studies.In that for Generator and Grid there are some options available as modes as"swing,voltage control,PF control,mvar control".I know the meaning of those modes of operation.But the problem is "are these types of modes of operations are available for gener

Welding and Rejection Control

Afresh in this point. The porcetaje of RT welding rejections of a welder must be calculated for welds, for films or for inches?. Is the same (W,F,I) for Random, or for Spot? . There is something written (Code, Standard...) about of this?. Several times I have stumbled over this situation without a

Non-Magnetizable S/S Wire

Hi all

I am looking to a supplier of non-magnetisable wire 1.50 mm diameter to specification werkstoff no. 1.3962 (X 15 CrNiMn 12 10) or equivalent.

Can anyone point me in the right direction?

Thanks

Power Supply as Battery Charger?

Dear all,

Is it possible to use a 24v supply as battery charger for a 12v battery (60AH, 5hour). what are the settings that i need to make on the power supply. i tried to set the following values on the power supply 14v and 5amps on the power supply but once i connected the battery the volt

Continuous Casting

we have 2x 8 tonnes of induction furnace with a 4/7 METRE RADIUS CONTINOUS CASTING MACHINE. WE TAP HEATS IN SEQUENCE AND THE CASTING IS DONE ON A CCM MACHINE. WE ARE UNABLE TO ACHIEVE CONTIOUS CASTING AS THERE IS A GAP OF 1 HOUR BETWEEN TO 2 CASTING. CAN YOU PLEASE SUGGEST ME A WAY BY WHICH I CAN AC

ID Controlled and OD Controlled Pipes

I am still not clear in ID and OD controlled pipes.

Some of the answers i got are

O.D. controlled

: This designation is used when the outside diameter of the pipe is the controlling factor in the selection of the pipe.

I.D. controlled

: This designation is us

How to Size Capacitor Banks

Dear Sir,

Normally the reactive power is varied upon the load in a time period.

So to sizing the capacitor bank, is it right that we need to reach the maximum reactive power value in that time frame? do we need to spare some?

Turbocharger Leaks Oil

We are commissioning a gas engine run on producer gas generatd in a woody biomass gasifier. It was seen that engine oil is accumulated in the intercooler. There was no oil before the turbo-charger. This unit has been operated only for less than 100 hours. How enver, we have replaced the sealing ring

Dust Extraction

Hey Everyone,

I'm a 3rd year chemical engineering student doing vac work at a company associated with TiO2 (pigment) production. Ive got a project at the moment to improve the dust extraction system where the pigment is being packed.

The system basically is a fan + motor to a 45mm diamater

Genset Controllers

Dear Engineers,

I am surfing through in this forum for more infor on the genest controllers notably those digital types rather than the conventional types with synchro scope but couldn't find them so i have decided to start this discussion.

I understand in the market there are couple of br