{"id":230530,"date":"2020-05-06T07:04:26","date_gmt":"2020-05-06T11:04:26","guid":{"rendered":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/viking-link-needs-client-representatives-offshore-wind\/"},"modified":"2020-05-06T07:04:26","modified_gmt":"2020-05-06T11:04:26","slug":"viking-link-needs-client-representatives-offshore-wind","status":"publish","type":"post","link":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/offshore\/viking-link-needs-client-representatives-offshore-wind\/","title":{"rendered":"Viking Link Needs Client Representatives &#8211; Offshore WIND"},"content":{"rendered":"<p><p>Danish transmission system operator Energinet is seeking client representatives for the 1400 MW Viking Link interconnector project.<\/p>\n<p>Viking Linkis a joint project of Energinet and the UKs National Grid Viking Link Limited. <\/p>\n<p>The tender calls for consultants working onboard the cable-laying vessels as client representatives for the full duration of the offshore cable laying campaigns. <\/p>\n<p>The tendered contract will comprise eleven client representatives, including a Project Manager\/Coordinator. During the cable laying campaign, two client representatives will be on board the cable-laying vessels. The client representatives will thus be working two and two in shifts, so that one pair will take over for another upon the crew change.<\/p>\n<p>The installation of the subsea cable is expected to commence in the second quarter of 2021 and finish in the third quarter of 2023, consisting of seven individual laying campaigns. <\/p>\n<p>The tender remains open until 26 May. The contract is valued at around EUR 1.5 million.<\/p>\n<p>Scheduled to begin commercial operation at the end of 2023, Viking Link will be a 760-kilometre DC interconnector line between Revsing in southern Jutland, Denmark, and Bicker Fen in Lincolnshire, UK. <\/p>\n<p>The interconnectors marine cable route has an approximate length of 630 kilometres.<\/p>\n<p>Prysmian will manufacture and install the entire 1,250-kilometre cable for the submarine route and all of the approximately 135 kilometres of land cables on the UK side.<\/p>\n<p>NKTwill manufactureand deliver the onshore cables to be installed in Denmark. Siemenswill delivertwo converter stations for the 1,400MW interconnector. <\/p>\n<p><!-- Auto Generated --><\/p>\n<p>See the rest here:<\/p>\n<p><a target=\"_blank\" rel=\"nofollow noopener noreferrer\" href=\"https:\/\/www.offshorewind.biz\/2020\/05\/05\/viking-link-needs-client-representatives\/\" title=\"Viking Link Needs Client Representatives - Offshore WIND\">Viking Link Needs Client Representatives - Offshore WIND<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p> Danish transmission system operator Energinet is seeking client representatives for the 1400 MW Viking Link interconnector project. Viking Linkis a joint project of Energinet and the UKs National Grid Viking Link Limited. The tender calls for consultants working onboard the cable-laying vessels as client representatives for the full duration of the offshore cable laying campaigns <a href=\"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/offshore\/viking-link-needs-client-representatives-offshore-wind\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[187814],"tags":[],"class_list":["post-230530","post","type-post","status-publish","format-standard","hentry","category-offshore"],"_links":{"self":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts\/230530"}],"collection":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/comments?post=230530"}],"version-history":[{"count":0,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts\/230530\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/media?parent=230530"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/categories?post=230530"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/tags?post=230530"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}