{"id":226551,"date":"2020-03-24T05:28:23","date_gmt":"2020-03-24T09:28:23","guid":{"rendered":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/petroleum-safety-authority-audits-north-sea-valhall-drilling-automation-measures-offshore-oil-and-gas-magazine\/"},"modified":"2020-03-24T05:28:23","modified_gmt":"2020-03-24T09:28:23","slug":"petroleum-safety-authority-audits-north-sea-valhall-drilling-automation-measures-offshore-oil-and-gas-magazine","status":"publish","type":"post","link":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/automation\/petroleum-safety-authority-audits-north-sea-valhall-drilling-automation-measures-offshore-oil-and-gas-magazine\/","title":{"rendered":"Petroleum Safety Authority audits North Sea Valhall drilling automation measures &#8211; Offshore Oil and Gas Magazine"},"content":{"rendered":"<p><p>The Valhall complex in the southern Norwegian North Sea.<\/p>\n<p>(Courtesy Aker BP)<\/p>\n<p>Offshore staff<\/p>\n<p>OSLO, Norway  The Norwegian Petroleum Safety Authority (PSA) has identified  three improvement points from its audit of Aker  BP and the modification, digitalization,  and automation  of the drilling installation on the Valhall IP platform in the southern  Norwegian North Sea. <\/p>\n<p>According to the PSA, the audit, performed between April 2019 and  January 2020, was conducted to verify the robustness of processes linked to the  qualification of new technology, equipment and systems, and to identify and  address any potential risks associated with the planned modification of the  drilling installation and relocation of the drillers cabin at Valhall IP.<\/p>\n<p>The Valhall IP Performinator project entails the following planned  changes at the platform:<\/p>\n<p>Although the audit revealed no new non-conformities, the PSA has  requested three improvements concerning decision support and decision-making  criteria for sub-deliveries in the project; preparation of required  documentation for barrier functions and safety-critical equipment; documentation  of criteria for qualification of new technology and equipment.<\/p>\n<p>03\/23\/2020<\/p>\n<p><!-- Auto Generated --><\/p>\n<p>See the article here:<\/p>\n<p><a target=\"_blank\" rel=\"nofollow noopener noreferrer\" href=\"https:\/\/www.offshore-mag.com\/drilling-completion\/article\/14170273\/petroleum-safety-authority-audits-north-sea-valhall-drilling-automation-measures\" title=\"Petroleum Safety Authority audits North Sea Valhall drilling automation measures - Offshore Oil and Gas Magazine\">Petroleum Safety Authority audits North Sea Valhall drilling automation measures - Offshore Oil and Gas Magazine<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p> The Valhall complex in the southern Norwegian North Sea. (Courtesy Aker BP) Offshore staff OSLO, Norway The Norwegian Petroleum Safety Authority (PSA) has identified three improvement points from its audit of Aker BP and the modification, digitalization, and automation of the drilling installation on the Valhall IP platform in the southern Norwegian North Sea. According to the PSA, the audit, performed between April 2019 and January 2020, was conducted to verify the robustness of processes linked to the qualification of new technology, equipment and systems, and to identify and address any potential risks associated with the planned modification of the drilling installation and relocation of the drillers cabin at Valhall IP <a href=\"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/automation\/petroleum-safety-authority-audits-north-sea-valhall-drilling-automation-measures-offshore-oil-and-gas-magazine\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[187732],"tags":[],"class_list":["post-226551","post","type-post","status-publish","format-standard","hentry","category-automation"],"_links":{"self":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts\/226551"}],"collection":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/comments?post=226551"}],"version-history":[{"count":0,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts\/226551\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/media?parent=226551"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/categories?post=226551"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/tags?post=226551"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}