{"id":211355,"date":"2017-08-11T18:30:39","date_gmt":"2017-08-11T22:30:39","guid":{"rendered":"http:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/i-10-widening-project-into-ascension-starts-in-early-2018-wbrz\/"},"modified":"2017-08-11T18:30:39","modified_gmt":"2017-08-11T22:30:39","slug":"i-10-widening-project-into-ascension-starts-in-early-2018-wbrz","status":"publish","type":"post","link":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/ascension\/i-10-widening-project-into-ascension-starts-in-early-2018-wbrz\/","title":{"rendered":"I-10 widening project into Ascension starts in early 2018 &#8211; WBRZ"},"content":{"rendered":"<p><p>    BATON ROUGE  Construction on the next phase to widen I-10 into    Ascension Parish from East Baton Rouge will begin in early    2018.  <\/p>\n<p>    DOTD announced it hired James Construction Group to do the    work.  <\/p>\n<p>    Designs call for three lanes in each direction from Highland    Road to La. 73.  <\/p>\n<p>    The project will take approximately two-and-a-half years to    complete and includes the widening I-10 from four lanes to six    lanes west of Highland Road to the LA 73 interchange, as well    as the replacement of the LA 42 overpass structures.  <\/p>\n<p>    We are excited to start this much-needed capacity project,    said DOTD Sec. Shawn Wilson. I-10 is not only an important    route for freight, but its also a major artery for commuters    who use it daily to travel between East Baton Rouge and    Ascension Parishes. This is yet another project that highlights    the necessity of having a well-funded transportation system and    shows this administrations dedication to using innovative    means, such as design-build, to fund and construct meaningful    projects. However, additional reliable, long-term funding will    be needed to complete the expansion of the I-10 corridor or the    construction of a new bridge.  <\/p>\n<p>    The $72 million project is being funded by a combination of    federal and state funds, including the use of over $40 million    in congressionally authorized repurposed earmarks, which are    one-time expenditures.  <\/p>\n<p>    In the Baton Rouge area, there are a handful of interstate    improvement projects happening: West of the Basin Bridge, work    is going on on I-10 toward Lafayette and in Baton Rouge, there    are plans being drawn up to improve interstate access to the    WashingtonTerrace Street area.  <\/p>\n<p>    ****************  <\/p>\n<p>    Follow the publisher of this post on Twitter: @treyschmaltz  <\/p>\n<p><!-- Auto Generated --><\/p>\n<p>See more here:<\/p>\n<p><a target=\"_blank\" rel=\"nofollow\" href=\"http:\/\/www.wbrz.com\/news\/i-10-widening-project-into-ascension-starts-in-early-2018\/\" title=\"I-10 widening project into Ascension starts in early 2018 - WBRZ\">I-10 widening project into Ascension starts in early 2018 - WBRZ<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p> BATON ROUGE Construction on the next phase to widen I-10 into Ascension Parish from East Baton Rouge will begin in early 2018. DOTD announced it hired James Construction Group to do the work.  <a href=\"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/ascension\/i-10-widening-project-into-ascension-starts-in-early-2018-wbrz\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[187766],"tags":[],"class_list":["post-211355","post","type-post","status-publish","format-standard","hentry","category-ascension"],"_links":{"self":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts\/211355"}],"collection":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/comments?post=211355"}],"version-history":[{"count":0,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts\/211355\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/media?parent=211355"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/categories?post=211355"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/tags?post=211355"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}