{"id":208104,"date":"2017-07-26T16:23:47","date_gmt":"2017-07-26T20:23:47","guid":{"rendered":"http:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/first-phase-of-university-ave-work-in-cf-nearly-done-waterloo-cedar-falls-courier\/"},"modified":"2017-07-26T16:23:47","modified_gmt":"2017-07-26T20:23:47","slug":"first-phase-of-university-ave-work-in-cf-nearly-done-waterloo-cedar-falls-courier","status":"publish","type":"post","link":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/cf\/first-phase-of-university-ave-work-in-cf-nearly-done-waterloo-cedar-falls-courier\/","title":{"rendered":"First phase of University Ave. work in CF nearly done &#8211; Waterloo Cedar Falls Courier"},"content":{"rendered":"<p><p>      CEDAR FALLS  One can now literally survey the landscape, or      landscaping, on reconstructed University Avenue in front of      College Square and Black Hawk Village.    <\/p>\n<p>      Work crews have installed new landscaping stones and      plantings in and around several roundabouts constructed in      front of the retail areas  at Waterloo and Holiday roads and      Boulder Drive, the first phase of the multi-year, $38.9      million project.    <\/p>\n<p>      The first phase in front of the mall and generally between      Grove Street and a point east of Waterloo Road, is about 95      percent complete, said Cedar Falls Community Development      Director Stephanie Houlk Sheetz.    <\/p>\n<p>      That work has a target completion date of July 31. Remaining      work includes construction on the north frontage road      generally between Waterloo and Holiday roads, as well as      sidewalks and landscaping.    <\/p>\n<p>      The second phase of work, generally from Waterloo Road to      Midway Drive, will be spread over two years. Crews are about      15 percent into that phase. They are working at either end of      that stretch of road, from Hillcrest Drive to Rownd Street      and from Cedar Heights to Midway, with a roundabout at      University and Cedar Heights.    <\/p>\n<p>      Work on each of those sections is anticipated to be completed      by about mid-November. The middle section, from Rownd to      Cedar Heights, would be worked on in 2018. Rownd Street would      remain a signalized intersection. Sheetz said the goal is to      have both the Rownd Street and Cedar Heights Drive      intersections complete by the end of the construction season      in November.    <\/p>\n<p>      The overall project calls for the narrowing of University      from its previous six lanes of travel  three lanes in each      direction  to four lanes, with two lanes of travel in each      direction. Roundabouts are being installed at six of the      eight previously signalized intersections. The third and      final phase would be the portion under relocated Iowa Highway      58, between Boulder Drive and Main Street. The design calls      for two roundabouts at the entrance and exit ramps to and      from University under the interchange  a double roundabout      configuration sometimes referred to as a dog bone.    <\/p>\n<p>      A major portion of University was once part of U.S. Highway      218, and then it became a state highway. The road had      deteriorated significantly over the years. The state turned      jursdiction of the road over to the city with $20 million to      bring it up to a good maintenance condition.    <\/p>\n<p>      Other revenues include sewer revenue bonds, local option      sales tax, storm water and Cedar Falls Utilities revenues and      street construction funds from the citys portion of state      gas tax revenues. The city also received a $500,000 state      safety grant for work at the Cedar Heights intersection and      $450,000 from the Black Hawk County Gaming Association for      bicycle, pedestrian and landscaping improvements.    <\/p>\n<p><!-- Auto Generated --><\/p>\n<p>Go here to read the rest:<\/p>\n<p><a target=\"_blank\" rel=\"nofollow\" href=\"http:\/\/wcfcourier.com\/news\/local\/govt-and-politics\/first-phase-of-university-ave-work-in-cf-nearly-done\/article_136adde6-fce5-555c-a3d0-8c142d9664aa.html\" title=\"First phase of University Ave. work in CF nearly done - Waterloo Cedar Falls Courier\">First phase of University Ave. work in CF nearly done - Waterloo Cedar Falls Courier<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p> CEDAR FALLS One can now literally survey the landscape, or landscaping, on reconstructed University Avenue in front of College Square and Black Hawk Village.  <a href=\"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/cf\/first-phase-of-university-ave-work-in-cf-nearly-done-waterloo-cedar-falls-courier\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[187753],"tags":[],"class_list":["post-208104","post","type-post","status-publish","format-standard","hentry","category-cf"],"_links":{"self":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts\/208104"}],"collection":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/comments?post=208104"}],"version-history":[{"count":0,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts\/208104\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/media?parent=208104"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/categories?post=208104"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/tags?post=208104"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}