{"id":207751,"date":"2017-07-25T12:38:10","date_gmt":"2017-07-25T16:38:10","guid":{"rendered":"http:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/the-top-5-emerging-markets-for-offshore-wind-greentech-media\/"},"modified":"2017-07-25T12:38:10","modified_gmt":"2017-07-25T16:38:10","slug":"the-top-5-emerging-markets-for-offshore-wind-greentech-media","status":"publish","type":"post","link":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/offshore\/the-top-5-emerging-markets-for-offshore-wind-greentech-media\/","title":{"rendered":"The Top 5 Emerging Markets for Offshore Wind &#8211; Greentech Media"},"content":{"rendered":"<p><p>    Offshore wind is all the rage right now,     competing without subsidies and floating into deeper waters    with     new foundation designs.  <\/p>\n<p>    For all its promise, however, offshore wind remains mostly a    European affair, with WindEurope data showing more than 12.6    gigawatts of capacity installed across 81 projects in 10    countries at the end of 2016. The picture is beginning to    change, however.  <\/p>\n<p>    Nations from Australia to India are reported to be harboring    offshore wind plans. Denmark's MAKE Consulting, a wind    consulting group owned by GTM's parent company, expects more    than 10 gigawatts of yearly offshore wind projects around the    world by 2026.  <\/p>\n<p>    Between 2017 and 2026, Asia will be nearly tied with Europe in    new offshore wind capacity development, according to MAKE.  <\/p>\n<\/p>\n<p>    Feng Zhao, a Copenhagen-based senior director at FTI    Consulting, agrees that Asia is the place to look for new    activity that can rival Europe.  <\/p>\n<p>    Here are his choices for the top five emerging markets in    offshore wind.  <\/p>\n<p>    As with onshore, China is quietly racing ahead in offshore wind    deployment. The country had installed more than 1.6 gigawatts    of offshore capacity at the end of 2016 and should end up with    around 900 megawatts more by the end of the year.  <\/p>\n<p>    Next year, it is due to pass 1 gigawatt of installations per    year as part of a five-year plan to have 5 gigawatts    grid-connected by 2020, plus another 10 gigawatts under    construction.  <\/p>\n<p>    Between 2017 and 2026, China is on target to install 13    gigawatts, bringing its total capacity to nearly 10 times    todays level. In the medium term, said Zhao, Its the only    market that can compete with the U.K. and Germany in terms of    market size.  <\/p>\n<p>    Its not an easy one for foreign vendors to crack, though, with    the lions share of projects going to Chinese original    equipment manufacturers (OEMs) such as Goldwind.  <\/p>\n<p>    Taiwans offshore aspirations made headlines this year when the    country declared a target of 3 gigawatts of capacity to be    built by 2025.  <\/p>\n<p>    The level is paltry compared to what is happening in    neighboring China, but for leading OEMs, the big attraction is    that Taiwan is an open market with no incumbent players to    dominate when it comes to winning contracts. FTI Consulting    estimates that growth in the market will ramp up slowly.  <\/p>\n<p>    Today there are only two offshore turbines operating in the    country, and two projects totaling 320 megawatts are due to be    in place by 2020. FTI Consulting forecasts close to 2.6    gigawatts, less than the government target, to be completed by    2026.  <\/p>\n<p>    Beyond that, it remains to be seen if the country will achieve    an ambitious 2030 target of 4 gigawatts, which is a third    higher than the original plan set out by Taiwans Ministry of    Economic Affairs in 2013.  <\/p>\n<p>    Much has been said about Japans offshore wind ambitions. But    the reality on the ground (or rather, in the sea) is well below    what might have been expected from a country that has been    pursuing offshore wind since 2010.  <\/p>\n<p>    Only 61 megawatts of capacity had been installed by the end of    2016, and for the next two years, we dont expect any    utility-scale offshore wind projects to [come] on-line, said    Zhao.  <\/p>\n<p>    However, following am update to the country's Port and Harbor    Law which opens previously restricted port areas to offshore    wind, two projects have won auctions.  <\/p>\n<p>    One is a 229-megawatt near-shore plant being built by utility    company Kyuden Mirai at Hibikinada, and the other is a    93.6-megawatt project that has been picked up by a consortium    including Hitachi Windpower after being dropped by Marubeni    Corporation in January.  <\/p>\n<p>    A further 1.3 gigawatts of projects are waiting to go through    environmental impact assessments. But in Japan, gaining    environmental permits takes four years, Zhao said.  <\/p>\n<p>    We forecast 1.3 gigawatts to be built in the next 10 years,    despite nearly 2.5 gigawatts currently under planning.  <\/p>\n<p>    For all its industrial might and maritime muscle, South Korea    has so far only mustered a couple of offshore wind prototypes    and a single demonstration project, totaling 35 megawatts.  <\/p>\n<p>    Only one plant, 96.8 megawatts on a tidal flat in Saemangeum,    is expected to be built in the next two years.  <\/p>\n<p>    However, the market is worthy of attention. Last month, South    Korea announced a move away from coal and nuclear power. This    should boost renewables, including offshore wind.  <\/p>\n<p>    It is technically possible to bring 1 gigawatt on-line between    2017 and 2026, following the new president's political    commitment on the country's transition to renewables, said    Zhao.  <\/p>\n<p>    The U.S. certainly has an emerging offshore wind market, but    it's unclear how promising it is. Last year saw 30 megawatts    installed -- Americas first offshore wind project.  <\/p>\n<p>    But no offshore wind turbines are expected to be installed this    year, and only two Department of Energy-sponsored projects,    totaling 32.7 megawatts, and one 12-megawatt test project, are    likely to be built before 2020.  <\/p>\n<p>    Construction of utility-scale projects is not expected to begin    until around 2021 or 2022. And although the U.S. could be    adding up to 800 megawatts of capacity per year by 2025 or    2026, a lot of things could change that outlook in the    meantime.  <\/p>\n<p><!-- Auto Generated --><\/p>\n<p>Read the original here:<\/p>\n<p><a target=\"_blank\" rel=\"nofollow\" href=\"https:\/\/www.greentechmedia.com\/articles\/read\/the-top-5-emerging-markets-for-offshore-wind\" title=\"The Top 5 Emerging Markets for Offshore Wind - Greentech Media\">The Top 5 Emerging Markets for Offshore Wind - Greentech Media<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p> Offshore wind is all the rage right now, competing without subsidies and floating into deeper waters with new foundation designs. For all its promise, however, offshore wind remains mostly a European affair, with WindEurope data showing more than 12.6 gigawatts of capacity installed across 81 projects in 10 countries at the end of 2016.  <a href=\"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/offshore\/the-top-5-emerging-markets-for-offshore-wind-greentech-media\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[187814],"tags":[],"class_list":["post-207751","post","type-post","status-publish","format-standard","hentry","category-offshore"],"_links":{"self":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts\/207751"}],"collection":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/comments?post=207751"}],"version-history":[{"count":0,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts\/207751\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/media?parent=207751"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/categories?post=207751"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/tags?post=207751"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}