{"id":200871,"date":"2017-06-23T06:36:01","date_gmt":"2017-06-23T10:36:01","guid":{"rendered":"http:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/look-out-for-4-megawatt-onshore-12-megawatt-offshore-wind-turbines-concludes-make-cleantechnica\/"},"modified":"2017-06-23T06:36:01","modified_gmt":"2017-06-23T10:36:01","slug":"look-out-for-4-megawatt-onshore-12-megawatt-offshore-wind-turbines-concludes-make-cleantechnica","status":"publish","type":"post","link":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/offshore\/look-out-for-4-megawatt-onshore-12-megawatt-offshore-wind-turbines-concludes-make-cleantechnica\/","title":{"rendered":"Look Out For 4 Megawatt Onshore &amp; 12 Megawatt Offshore Wind Turbines, Concludes MAKE &#8211; CleanTechnica"},"content":{"rendered":"<p><p>    June 22nd, 2017 by Joshua S Hill  <\/p>\n<p>    The speed of technological innovation being seen in the wind    energy sector is advancing at such a pace that we can now    expect to see 4 MW onshore wind turbines and 12 MW offshore    wind turbines making their way into services in the next few    years.  <\/p>\n<p>    This is the key conclusion from a new report from renewable    energy analysts MAKE Consulting, which this week published a    new research note highlighting next generation wind turbine    models. Specifically, MAKE predicts that with the pace of    technological innovation continuing at such a rapid clip,    forcing ever-more impressive advances, the competition in    global market will continue to be fierce, forcing original    equipment manufacturers (OEMs) to continually innovate and    create bigger and better wind turbines to stand out from the    crowd.  <\/p>\n<p>    One of the primary methods OEMs are attempting to differentiate    themselves from the pack is to continue to lower the Levelized    Cost of Electricity for their wind turbines. Further, most OEMs    are focusing their attention on deploying wind turbine    platforms, which allow for greatermaneuverability, and    allows the companies to accelerate their design cycles. MAKE    also points out that this insanely competitive marketplace is    causing Turbine Life Cycles (TLC) to shorten, with current    products being quickly outpaced and replaced with newer and    larger turbines.  <\/p>\n<p>    More specifically, MAKE Consulting highlights the greater    penetration of the 3 MW wind turbine platforms, which now    represent more than 23% of global wind energy installations, up    from 8% only 5 years ago. In 2016 alone, 3 MW onshore wind    turbines were installed in nearly 40 markets, with even    emerging economies looking to the larger turbines for their    needs. This trend is likely to see the next generation of 4 MW    wind turbines quickly make their way to market, and MAKE    expects OEMs to announce their 4 MW offerings by the end of the    next year.  <\/p>\n<p>    Interestingly, with severe logistic challenges inherent in    turbine blades longer than 70 meters, MAKE expects many OEMs to    begin developing modular blades to get around these    limitations.  <\/p>\n<p>    Moving offshore, MAKE predicts that the next generation of 10    to 12 MW wind turbines are similarly only a couple of years    away, with R&D already in full swing to bring these    turbines to market. 12 MW wind turbines are likely to require    rotors in excess of 200 meters.  <\/p>\n<p>    Already we have seen OEM MHI Vestas reveal interim development    progress, earlier this month revealing    its 9.5 MW wind turbine, part of its V164 series.This    currently ranks as the most powerful serially-produced wind    turbine in the world, according to MHI Vestas, with massive    80-meter blades that result in a swept area of 21,124    meters-squared, which is larger than the London Eye.  <\/p>\n<p>    Check out our new     93-page EV report.  <\/p>\n<p>    Join us for an upcoming Cleantech Revolution    Tour conference!  <\/p>\n<p>    Tags: 12 MW, 12MW,    3    MW, 3MW, MAKE    Consulting, wind    OEMs<\/p>\n<p>      Joshua S Hill      I'm a Christian, a nerd, a geek, and I believe that we're      pretty quickly directing planet-Earth into hell in a      handbasket! I also write for Fantasy Book Review (.co.uk),      and can be found writing articles for a variety of other      sites. Check me out at about.me for more.    <\/p>\n<p><!-- Auto Generated --><\/p>\n<p>Original post: <\/p>\n<p><a target=\"_blank\" rel=\"nofollow\" href=\"https:\/\/cleantechnica.com\/2017\/06\/22\/look-4-mw-onshore-12-mw-offshore-wind-turbines-make\/\" title=\"Look Out For 4 Megawatt Onshore &amp; 12 Megawatt Offshore Wind Turbines, Concludes MAKE - CleanTechnica\">Look Out For 4 Megawatt Onshore &amp; 12 Megawatt Offshore Wind Turbines, Concludes MAKE - CleanTechnica<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p> June 22nd, 2017 by Joshua S Hill The speed of technological innovation being seen in the wind energy sector is advancing at such a pace that we can now expect to see 4 MW onshore wind turbines and 12 MW offshore wind turbines making their way into services in the next few years.  <a href=\"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/offshore\/look-out-for-4-megawatt-onshore-12-megawatt-offshore-wind-turbines-concludes-make-cleantechnica\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[187814],"tags":[],"class_list":["post-200871","post","type-post","status-publish","format-standard","hentry","category-offshore"],"_links":{"self":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts\/200871"}],"collection":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/comments?post=200871"}],"version-history":[{"count":0,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts\/200871\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/media?parent=200871"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/categories?post=200871"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/tags?post=200871"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}