{"id":185386,"date":"2017-03-29T11:44:55","date_gmt":"2017-03-29T15:44:55","guid":{"rendered":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/chinese-jv-orders-3-haliade-offshore-wind-turbines-renewables-now-subscription\/"},"modified":"2017-03-29T11:44:55","modified_gmt":"2017-03-29T15:44:55","slug":"chinese-jv-orders-3-haliade-offshore-wind-turbines-renewables-now-subscription","status":"publish","type":"post","link":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/offshore\/chinese-jv-orders-3-haliade-offshore-wind-turbines-renewables-now-subscription\/","title":{"rendered":"Chinese JV orders 3 Haliade offshore wind turbines &#8211; Renewables Now (subscription)"},"content":{"rendered":"<p><p>    March 29 (Renewables Now) - GE Renewable Energy will be    supplying three offshore wind turbines of the Haliade 150-6MW    model for a demonstration project in China, the General    Electric (NYSE:GE) unit said Monday.  <\/p>\n<p>    Fuqing Haixia Electricity Generation Co, a joint venture (JV)    between China Three Gorges Corp and Fujian Energy, will build    the 73-MW Fujian Xinghua Gulf offshore wind farm using turbines    by several suppliers. The deal for GE includes technical    support and two years of operation and maintenance (O&M).  <\/p>\n<p>    The US company said it will manufacture the three nacelles and    generators at its Offshore Wind facility in Saint-Nazaire,    France, while the blades will be made in Denmark. Towers for    the wind turbines will be produced in Chengxi, China.  <\/p>\n<p>    Installation is to take place in the closing quarter of 2017.  <\/p>\n<p>    The Haliade turbine has been developed by French Alstom, the    power and grid businesses of which were bought by GE in 2015.    The US conglomerate recently got the     European Commissions (EC) approval to also buy Danish wind    turbine blade maker LM Wind Power. The latter is     expanding its capacity after a deal to supply blades to the    Haliade platform.  <\/p>\n<p>        China ranked third in terms of total installed offshore wind    capacity at the end of 2016 after adding 592 MW in the    year. Chinese offshore market began what many hope is the    sectors long awaited take-off in 2016, the Global Wind Energy    Council (GWEC) said when releasing statistics for the past    year.  <\/p>\n<p><!-- Auto Generated --><\/p>\n<p>Read the original here:<\/p>\n<p><a target=\"_blank\" rel=\"nofollow\" href=\"https:\/\/renewablesnow.com\/news\/chinese-jv-orders-3-haliade-offshore-wind-turbines-563359\/\" title=\"Chinese JV orders 3 Haliade offshore wind turbines - Renewables Now (subscription)\">Chinese JV orders 3 Haliade offshore wind turbines - Renewables Now (subscription)<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p> March 29 (Renewables Now) - GE Renewable Energy will be supplying three offshore wind turbines of the Haliade 150-6MW model for a demonstration project in China, the General Electric (NYSE:GE) unit said Monday. Fuqing Haixia Electricity Generation Co, a joint venture (JV) between China Three Gorges Corp and Fujian Energy, will build the 73-MW Fujian Xinghua Gulf offshore wind farm using turbines by several suppliers. The deal for GE includes technical support and two years of operation and maintenance (O&#038;M) <a href=\"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/offshore\/chinese-jv-orders-3-haliade-offshore-wind-turbines-renewables-now-subscription\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[187814],"tags":[],"class_list":["post-185386","post","type-post","status-publish","format-standard","hentry","category-offshore"],"_links":{"self":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts\/185386"}],"collection":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/comments?post=185386"}],"version-history":[{"count":0,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts\/185386\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/media?parent=185386"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/categories?post=185386"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/tags?post=185386"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}