{"id":179659,"date":"2017-02-24T18:30:11","date_gmt":"2017-02-24T23:30:11","guid":{"rendered":"http:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/badger-board-approves-wall-for-robotics-team-space-east-grand-forks-exponent\/"},"modified":"2017-02-24T18:30:11","modified_gmt":"2017-02-24T23:30:11","slug":"badger-board-approves-wall-for-robotics-team-space-east-grand-forks-exponent","status":"publish","type":"post","link":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/robotics\/badger-board-approves-wall-for-robotics-team-space-east-grand-forks-exponent\/","title":{"rendered":"Badger board approves wall for robotics team space &#8211; East Grand Forks Exponent"},"content":{"rendered":"<p>\n<\/p>\n<\/p>\n<\/p>\n<\/p>\n<\/p>\n<\/p>\n<\/p>\n<\/p>\n<p>      Badger Robotics team drivers Kaeden Hietala and Kennedy      Truscinski look out at the model arena as they drive their      team robot in a practice session with the Greenbush-Middle      River Robotics team at DRB Fabrication in Greenbush on      February 19. At its February 13 meeting, the Badger School      Board approved designating no more than $4000 to build a      60-foot long wall to create a more conducive space in the      Badger Bus Garage for the Badger Robotics team to call      home.    <\/p>\n<p>    At its February 13 meeting, the Badger School    Board approved granting the district permission to designate no    more than $4000 to build a 60-foot long wall to create a more    conducive space in the Badger Bus Garage for the Badger    Robotics team to call home.  <\/p>\n<p>    Making this motion, board member Carol Rhen    added that she thinks its prudent to post this project on    the school website and to count on board members word of    mouth, both coming at no cost to the district, to call out for    bids on this project. Superintendent Tom Jerome agreed to post    this info on the district website, including a deadline for    response.  <\/p>\n<p>    This request came after the robotics team    moved from working in the Badger Industrial Arts Room and into    what Jerome termed dead space, used for odds and ends, in    front of three fleet vehicles located in the Badger Bus Garage.    The team would like this space converted to provide a secure    area and conducive atmosphere for them to work in the winter    months.  <\/p>\n<p>    To improve the insulation of this space,    Jerome asked the board if the district could pursue this    project, totaling, according to Allen Monsrud Construction,    $3300. The district at that time hadnt yet asked for any bids    outside this one. Speaking with Badger Transportation Director    Tim Berger, Jerome said Berger told him he was fine with    repurposing this space if the students were going to use    it.  <\/p>\n<p>    Speaking of students, board member Hauger    asked if industrial arts students could build this wall. He at    first made an initial motion to appropriate $3000 towards the    project, have the district meet with Badger Industrial Arts    teacher Mike Coltom to see if his students could do the    project, and if not, to still go through with the    project.  <\/p>\n<p>    Board Chairperson Jamie Isane questioned    whether having students build this wall could be more trouble    than its worth, being the district has to deal with building    codes. Badger Dean of Students Stacey Warne added that the    district isnt offering a construction class until next fall.    This initial motion made by Hauger didnt move forward.  <\/p>\n<p>    Jerome then added that if the board wanted    this wall built relatively soon, it could move forward with the    project, or, if not, could wait until the fall. He did add that    the build season is coming to an end soon February 21 to be    exact.  <\/p>\n<p>    Board member Jeramy Swenson, a Badger Robotics    team mentor, told the board that if it approved Allen Monsrud    to do the project, Monsrud could have the project done that    Wednesday (February 15).  <\/p>\n<p>    Hauger responded by saying he would like to be    fair and ask for bids from others, realizing it could set the    project back. Jerome then brought up the idea of calling out    for bids on the school website.  <\/p>\n<p>    Isane understood the idea of being fair to    all, but didnt think they would see many differences in bids    on a project of this size. Hauger then asked Swenson his    opinion in terms of how imperative it was to have the project    done now.  <\/p>\n<p>    Swenson said he would like to see the project    done now to provide the robotics team a home. As of February    21, the project hadnt yet began.  <\/p>\n<p>    To see more from this meeting, read the    February 22 issue of The Tribune. To find out more about the    Badger Robotics and the Greenbush-Middle River Robotics teams,    read an upcoming issue of The Tribune.   <\/p>\n<p><!-- Auto Generated --><\/p>\n<p>Continue reading here: <\/p>\n<p><a target=\"_blank\" rel=\"nofollow\" href=\"http:\/\/www.page1publications.com\/2017\/02\/24\/badger-board-approves-wall-for-robotics-team-space\/\" title=\"Badger board approves wall for robotics team space - East Grand Forks Exponent\">Badger board approves wall for robotics team space - East Grand Forks Exponent<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p> Badger Robotics team drivers Kaeden Hietala and Kennedy Truscinski look out at the model arena as they drive their team robot in a practice session with the Greenbush-Middle River Robotics team at DRB Fabrication in Greenbush on February 19. At its February 13 meeting, the Badger School Board approved designating no more than $4000 to build a 60-foot long wall to create a more conducive space in the Badger Bus Garage for the Badger Robotics team to call home <a href=\"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/robotics\/badger-board-approves-wall-for-robotics-team-space-east-grand-forks-exponent\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[187746],"tags":[],"class_list":["post-179659","post","type-post","status-publish","format-standard","hentry","category-robotics"],"_links":{"self":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts\/179659"}],"collection":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/comments?post=179659"}],"version-history":[{"count":0,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts\/179659\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/media?parent=179659"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/categories?post=179659"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/tags?post=179659"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}