{"id":1127213,"date":"2024-07-21T16:59:37","date_gmt":"2024-07-21T20:59:37","guid":{"rendered":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/uncategorized\/brazil-could-tap-into-96-gw-of-offshore-wind-by-2050-says-world-bank-report-offshore-wind\/"},"modified":"2024-07-21T16:59:37","modified_gmt":"2024-07-21T20:59:37","slug":"brazil-could-tap-into-96-gw-of-offshore-wind-by-2050-says-world-bank-report-offshore-wind","status":"publish","type":"post","link":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/offshore\/brazil-could-tap-into-96-gw-of-offshore-wind-by-2050-says-world-bank-report-offshore-wind\/","title":{"rendered":"Brazil Could Tap Into 96 GW of Offshore Wind by 2050, Says World Bank Report &#8211; Offshore WIND"},"content":{"rendered":"<p><p>    Brazil holds a technical offshore wind potential of    over 1,200 GW and  with offshore wind strategy and policies,    permitting regulations, grid and port upgrades in place  could    install as much as 96 GW of generation capacity by 2050,    according to a study released by the World Bank Group.  <\/p>\n<p>    The study, conducted by DNV, cites     the World Banks estimates published in 2020, which show    Brazil has 1,228 GW of potential offshore wind to tap into,    including 480 GW through fixed-bottom (at water depths less    than 70 metres) and 748 GW through floating wind technology (at    water depths from 70 metres to 1 kilometre).  <\/p>\n<p>    Building on this, the report Scenarios for Offshore Wind    Development in Brazil brings three scenarios that show that    even with the base case, Brazil has an opportunity to install    16 GW by 2050, which represents 3 per cent of the countrys    generation capacity.  <\/p>\n<p>    The intermediate growth scenario envisages 32 GW of installed    offshore wind capacity by 2050 and, according to the ambitious    scenario, the country could build as much as 96 GW of offshore    wind farms by 2050  if a clear energy strategy, significant    infrastructure investment, and prompt action to harness the    growing interest in offshore wind in Brazil are made.  <\/p>\n<p>    Offshore wind can support Brazils green hydrogen targets,    drive economic growth, and potentially create up to 516,000    full-time equivalent (FTE) jobs and contribute USD 168 billion    (approximately EUR 154 billion) in national gross value added    under the third, ambitious scenario.  <\/p>\n<p>    Among the challenges to fulfilling these scenarios, the report    highlights that, since offshore wind has higher initial costs,    Brazil would need to explore options for concessional finance    and will also need to ensure that initial seabed rights are    allocated primarily based on qualitative rather than    price-based criteria.  <\/p>\n<p>    Transmission upgrades and grid flexibility to integrate    offshore wind effectively into the energy mix would also    require substantial investments. Upgrades are also needed on    regional ports and the logistics infrastructure, and the supply    chain needs to be developed to support the production of large    components, all of which adds to the overall costs.  <\/p>\n<p>    Furthermore, clear permitting policies are needed as    environmental and social considerations require meticulous    planning and community consultations.  <\/p>\n<p>    Whatever course policymakers and stakeholders choose to    chart, they must act swiftly to capitalize on current interest,    particularly amid waning investor enthusiasm for emerging    markets. Updates in transmission networks, port infrastructure,    and manufacturing capabilities, along with Environmental &    Social sensitivity mapping  all prerequisites for offshore    wind development , have lengthy timelines. Providing a clear    market entry pathway, including seabed exclusivity and offtake    arrangements in initial offshore wind auctions, is    essential, DNV stated in a press release issued on 18    July.  <\/p>\n<p>    DNV and the World Bank prepared the study in collaboration with    Brazils Ministry of Mining and Energy (MME), and the Energy    Research Office (EPE), to provide a thorough analysis for    policymakers and stakeholders.  <\/p>\n<p>    Last year, the Ministry and EPE published a new version of    Brazils offshore wind roadmap after the regulatory framework    for energy generation was updated.  <\/p>\n<p>    The new offshore wind    roadmap includes considerations regarding the assignment of    federal areas for offshore wind development in accordance with    Brazils law on regularisation, administration, leasing and    disposal of areas.  <\/p>\n<p>    Interest in exploring the feasibility and construction of    offshore wind farms in Brazil has been shown by multiple    industry players, especially over the past few years, during    which the Institute for the Environment and Natural Resources    (IBAMA) has been receiving applications for environmental    investigation licences in connection with offshore wind    projects.  <\/p>\n<p>        Many of the projectshave been proposed by European    developers, including Iberdrola (through its Brazilian    subsidiary Neoenergia), Acciona, Corio Generation and oil & gas    majors TotalEnergies, Shell, and Equinor, as well as Brazils    Petrobras.  <\/p>\n<p>    According to the last update from IBAMA in April, there are now    applications for environmental investigation permits for 97    projects totalling more than 234 GW of potential generation    capacity.  <\/p>\n<p>    Follow offshoreWIND.biz on:  <\/p>\n<p><!-- Auto Generated --><\/p>\n<p>Continued here: <\/p>\n<p><a target=\"_blank\" rel=\"nofollow noopener\" href=\"https:\/\/www.offshorewind.biz\/2024\/07\/18\/brazil-could-tap-into-96-gw-of-offshore-wind-by-2050-says-world-bank-report\/\" title=\"Brazil Could Tap Into 96 GW of Offshore Wind by 2050, Says World Bank Report - Offshore WIND\">Brazil Could Tap Into 96 GW of Offshore Wind by 2050, Says World Bank Report - Offshore WIND<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p> Brazil holds a technical offshore wind potential of over 1,200 GW and with offshore wind strategy and policies, permitting regulations, grid and port upgrades in place could install as much as 96 GW of generation capacity by 2050, according to a study released by the World Bank Group. The study, conducted by DNV, cites the World Banks estimates published in 2020, which show Brazil has 1,228 GW of potential offshore wind to tap into, including 480 GW through fixed-bottom (at water depths less than 70 metres) and 748 GW through floating wind technology (at water depths from 70 metres to 1 kilometre).  <a href=\"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/offshore\/brazil-could-tap-into-96-gw-of-offshore-wind-by-2050-says-world-bank-report-offshore-wind\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[187814],"tags":[],"class_list":["post-1127213","post","type-post","status-publish","format-standard","hentry","category-offshore"],"_links":{"self":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts\/1127213"}],"collection":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/comments?post=1127213"}],"version-history":[{"count":0,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts\/1127213\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/media?parent=1127213"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/categories?post=1127213"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/tags?post=1127213"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}