{"id":1127192,"date":"2024-07-21T16:59:24","date_gmt":"2024-07-21T20:59:24","guid":{"rendered":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/uncategorized\/dragados-and-siemens-energy-win-3bn-offshore-grid-connection-contract-splash-247\/"},"modified":"2024-07-21T16:59:24","modified_gmt":"2024-07-21T20:59:24","slug":"dragados-and-siemens-energy-win-3bn-offshore-grid-connection-contract-splash-247","status":"publish","type":"post","link":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/offshore\/dragados-and-siemens-energy-win-3bn-offshore-grid-connection-contract-splash-247\/","title":{"rendered":"Dragados and Siemens Energy win $3bn offshore grid connection contract &#8211; Splash 247"},"content":{"rendered":"<p><p>    Spains Dragados Offshore in consortium with Germanys Siemens    Energy has won a deal to construct a new converter system for    the LanWin3 offshore grid connection project in the German    North Sea.  <\/p>\n<p>    It was awarded by transmission system operator 50Hertz and the    EPCI contract includes all engineering services, the    procurement of the necessary components as well as the    construction, transportation, and installation of the systems    at sea and on land. The deal is worth around 2.9bn ($3.17bn).  <\/p>\n<p>    The offshore platform will be built at Dragados Offshore yard    in Cdiz, Spain, while the HVDC components for the converter    will be manufactured at European production sites by Siemens    Energy.  <\/p>\n<p>    The LanWin3 offshore grid connection will connect a 2GW    offshore wind farm in the North Sea to the mainland. It is    located around 120 km northwest of Helgoland within the German    EEZ. From there, a sea and land cable will run over 200 km to    the grid connection point in the Heide area in North Friesland.  <\/p>\n<p>    On the land side, the offshore grid connection systems LanWin3,    operated by 50Hertz, and LanWin2, operated by TenneT, will be    connected to the NordOstLink, a high-performance HVDC    transmission line to be built from Mecklenburg to Western    Pomerania.  <\/p>\n<p>    The onshore counterpart to the offshore converter will be built    near Schwerin to convert the direct current into alternating    current. Both the offshore grid connections and the HVDC will    have a voltage level of 525 kV to be able to transport large    amounts of electricity with low losses.  <\/p>\n<p><!-- Auto Generated --><\/p>\n<p>View post: <\/p>\n<p><a target=\"_blank\" rel=\"nofollow noopener\" href=\"https:\/\/splash247.com\/dragados-and-siemens-energy-win-3bn-offshore-grid-connection-contract\/\" title=\"Dragados and Siemens Energy win $3bn offshore grid connection contract - Splash 247\">Dragados and Siemens Energy win $3bn offshore grid connection contract - Splash 247<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p> Spains Dragados Offshore in consortium with Germanys Siemens Energy has won a deal to construct a new converter system for the LanWin3 offshore grid connection project in the German North Sea.  <a href=\"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/offshore\/dragados-and-siemens-energy-win-3bn-offshore-grid-connection-contract-splash-247\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[187814],"tags":[],"class_list":["post-1127192","post","type-post","status-publish","format-standard","hentry","category-offshore"],"_links":{"self":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts\/1127192"}],"collection":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/comments?post=1127192"}],"version-history":[{"count":0,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts\/1127192\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/media?parent=1127192"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/categories?post=1127192"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/tags?post=1127192"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}