{"id":1087285,"date":"2022-09-03T16:39:11","date_gmt":"2022-09-03T20:39:11","guid":{"rendered":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/uncategorized\/two-us-companies-join-vineyard-wind-1-team-offshore-wind\/"},"modified":"2022-09-03T16:39:11","modified_gmt":"2022-09-03T20:39:11","slug":"two-us-companies-join-vineyard-wind-1-team-offshore-wind","status":"publish","type":"post","link":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/offshore\/two-us-companies-join-vineyard-wind-1-team-offshore-wind\/","title":{"rendered":"Two US Companies Join Vineyard Wind 1 Team &#8211; Offshore WIND"},"content":{"rendered":"<p><p>Vineyard Wind has signed contracts with Maine-based Ironhouse and Houston-based EverLine to support the Vineyard Wind 1 offshore wind project at various construction and operation stages.<\/p>\n<p>EverLine, a provider of energy compliance, technical, and security solutions, will deliver complete Supervisory Control and Data Acquisition (SCADA) integration for the 62 wind turbines, a system that will connect the fields offshore and onshore substation, wind turbines, and offices. <\/p>\n<p>The company will also be responsible for procuring equipment, configuring devices, installing and configuring SCADA software, and testing and commissioning all IT and SCADA systems. <\/p>\n<p>Additionally, Ironhouse will provide the commissioning oversight for the onshore substation, wind turbine foundation, inter-array cables, wind turbines, and SCADA system. <\/p>\n<p>The 800 MW Vineyard Wind 1, a 50-50 joint venture between Avangrid and Copenhagen Infrastructure Partners (CIP) funds CI II and CI III, is currently under construction off the coast of Massachusetts.<\/p>\n<p>As we build the nations first offshore wind farm, we are proud to engage an ever-increasing amount of the US workforce in each step of the process. Vineyard Wind 1 is only the beginning. With each project, we will take a giant leap forward in building out this new industry, creating thousands of good-paying jobs and reducing the harmful effects of carbon pollution, said Klaus S. Moeller, CEO of Vineyard Wind. <\/p>\n<p>Located 15 miles (approximately 24 kilometres) off the coast of Marthas Vineyard, the project is the first commercial-scale offshore wind farm in the US to achievefinancial closeand, at USD 2.3 billion, represents one of the largest investments in a single renewable energy project in the US.<\/p>\n<p>Vineyard Wind 1will feature62 GE Haliade-X 13 MW wind turbines,to be installedby DEME Offshores US arm.<\/p>\n<p>Scheduled to deliver its first power to the grid in 2023, the wind farm will generate enough electricity for more than 400,000 homes and businesses in the Commonwealth of Massachusetts. <\/p>\n<p>Follow offshoreWIND.biz on:<\/p>\n<p><!-- Auto Generated --><\/p>\n<p>Read more from the original source: <\/p>\n<p><a target=\"_blank\" rel=\"nofollow noopener\" href=\"https:\/\/www.offshorewind.biz\/2022\/09\/01\/two-us-companies-join-vineyard-wind-1-team\/\" title=\"Two US Companies Join Vineyard Wind 1 Team - Offshore WIND\">Two US Companies Join Vineyard Wind 1 Team - Offshore WIND<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p> Vineyard Wind has signed contracts with Maine-based Ironhouse and Houston-based EverLine to support the Vineyard Wind 1 offshore wind project at various construction and operation stages.  <a href=\"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/offshore\/two-us-companies-join-vineyard-wind-1-team-offshore-wind\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[187814],"tags":[],"class_list":["post-1087285","post","type-post","status-publish","format-standard","hentry","category-offshore"],"_links":{"self":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts\/1087285"}],"collection":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/comments?post=1087285"}],"version-history":[{"count":0,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts\/1087285\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/media?parent=1087285"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/categories?post=1087285"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/tags?post=1087285"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}