{"id":1059837,"date":"2022-02-15T06:24:11","date_gmt":"2022-02-15T11:24:11","guid":{"rendered":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/uncategorized\/how-to-create-a-bar-or-circle-progress-chart-in-excel-twcn-tech-news\/"},"modified":"2022-02-15T06:24:11","modified_gmt":"2022-02-15T11:24:11","slug":"how-to-create-a-bar-or-circle-progress-chart-in-excel-twcn-tech-news","status":"publish","type":"post","link":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/progress\/how-to-create-a-bar-or-circle-progress-chart-in-excel-twcn-tech-news\/","title":{"rendered":"How to create a Bar or Circle Progress Chart in Excel &#8211; TWCN Tech News"},"content":{"rendered":"<p><p>A Chart is a graphical representation of data, such as a pie chart, bar graph, line graph, etc. Charts can make the information interesting, appealing, and easy to read for your audience.<\/p>\n<p>A Progress Chart is a graphical representation of the degree of completion of work in progress. Progress charts help individuals to monitor their objectives and provide critical data for strategic decision-making.<\/p>\n<p>Follow the tutorial below to create a Progress Chart in Excel.<\/p>\n<p>Follow the steps to create a Progress Bar Chart:<\/p>\n<p>Launch Excel.<\/p>\n<p>Enter some data on your spreadsheet or use existing data.<\/p>\n<p>Highlight the data range.<\/p>\n<\/p>\n<p>Click the Insert tab.<\/p>\n<p>Click the Insert Column or Bar Chart button in the Charts group and select the Clustered Bar under the 2-D Bar from the menu.<\/p>\n<p>The Clustered Bar will appear on the spreadsheet.<\/p>\n<\/p>\n<p>Click the Switch the Rows\/Column button to place the Product column in the table on the vertical axis.<\/p>\n<p>The Product column will switch to the vertical axis, and the other columns will switch to the legend entry on the chart.<\/p>\n<p>Right-click the Target data series and choose Format Data Series from the context menu.<\/p>\n<p>A Format Data Series pane will appear on the right.<\/p>\n<\/p>\n<p>Click the Fill and Line tab.<\/p>\n<p>Click Fill, then click No Fill.<\/p>\n<\/p>\n<p>Click Border and select Solid Line.<\/p>\n<p>Then choose a color for the border of the no-filled bar.<\/p>\n<p>Close the Format Data Series pane.<\/p>\n<\/p>\n<p>Click the chart plot area and then click the Design chart tab.<\/p>\n<p>Then, click the Add Chart Element button, hover the cursor over Data Labels, and select Inside Base.<\/p>\n<p>All the data series is inserted into the bar chart.<\/p>\n<\/p>\n<p>Delete all data labels inside the bar charts bar except the percentage.<\/p>\n<\/p>\n<p>Right-click the Target data series again, and choose Format data series from the context menu.<\/p>\n<\/p>\n<p>Under Series, options set the Series Overlap to 100%.<\/p>\n<p>Click the horizontal (value) axis.<\/p>\n<\/p>\n<p>On the Format Data Series pane on the right, click the Axis Options button.<\/p>\n<p>Set the Maximum target value for your chart in the Maximum entry box.<\/p>\n<p>Close the Format Data Series pane.<\/p>\n<\/p>\n<p>Now we have a Progress Bar Chart.<\/p>\n<p>Launch Excel.<\/p>\n<p>Enter some data on your spreadsheet or use existing data.<\/p>\n<p>Highlight the data range.<\/p>\n<\/p>\n<p>Click the Insert tab.<\/p>\n<p>Click the Insert Pie or Doughnut chart button in the Charts group and select Dougnut from the drop-down menu.<\/p>\n<\/p>\n<p>Now we are going to resize the doughnut chart hole size.<\/p>\n<p>Double click any of the doughnut slices; for instance, we will double series 1 point 1.<\/p>\n<p>The Format Data Point pane will appear on the right.<\/p>\n<p>On the Series Options tab, under Series options, set the Dougnut hole size to 60%.<\/p>\n<p>Now we are going to recolor the slices of the doughnut chart.<\/p>\n<\/p>\n<p>Still, on the series 1 point 1 slice, click the Fill and Line tab on the Format Data Point pane.<\/p>\n<p>Under Fill, click Solid Fill.<\/p>\n<p>Then choose a color.<\/p>\n<p>Set the Transparency to 30%.<\/p>\n<\/p>\n<p>On the chart, double click the series 1 point 2 slice to customize the series 1 point 2.<\/p>\n<p>Still, on the Fill and Line tab, click Fill, then click Solid Fill.<\/p>\n<p>Choose a color.<\/p>\n<\/p>\n<p>Click the plot area on the chart, then click a slice to select both series 1 point 1 and series 1 point 2.<\/p>\n<\/p>\n<p>Then click the series 1 point 1 slice and select the Fill and Line tab on the Format Data Series pane.<\/p>\n<p>Click Border, select Solid line, and choose a color.<\/p>\n<p>Also, under Border, set the width to 2pt.<\/p>\n<p>Close the Format Data Series pane.<\/p>\n<p>Now, we will add a textbox to the chart.<\/p>\n<\/p>\n<p>Click the Insert tab.<\/p>\n<p>Click Text and select a text box.<\/p>\n<\/p>\n<p>Draw the text in the hole of the doughnut circle.<\/p>\n<p>Type = A2 into the formula bar and press enter.<\/p>\n<p>Adjust the size, weight, style to your taste.<\/p>\n<\/p>\n<p>Delete the legend entry.<\/p>\n<p>Now, we have a progress circle.<\/p>\n<p>Read:How to create a Half Pie Chart in Excel.<\/p>\n<p>We hope this tutorial helps you understand how to create a progress chart in Microsoft Excel; if you have questions about the tutorial, let us know in the comments.<\/p>\n<p><!-- Auto Generated --><\/p>\n<p>Excerpt from: <\/p>\n<p><a target=\"_blank\" rel=\"nofollow noopener\" href=\"https:\/\/www.thewindowsclub.com\/how-to-create-a-bar-or-circle-progress-chart-in-excel\" title=\"How to create a Bar or Circle Progress Chart in Excel - TWCN Tech News\">How to create a Bar or Circle Progress Chart in Excel - TWCN Tech News<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p> A Chart is a graphical representation of data, such as a pie chart, bar graph, line graph, etc.  <a href=\"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/progress\/how-to-create-a-bar-or-circle-progress-chart-in-excel-twcn-tech-news\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[187725],"tags":[],"class_list":["post-1059837","post","type-post","status-publish","format-standard","hentry","category-progress"],"_links":{"self":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts\/1059837"}],"collection":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/comments?post=1059837"}],"version-history":[{"count":0,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts\/1059837\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/media?parent=1059837"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/categories?post=1059837"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/tags?post=1059837"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}