{"id":1049724,"date":"2021-12-22T00:55:59","date_gmt":"2021-12-22T05:55:59","guid":{"rendered":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/uncategorized\/litgrid-starts-offshore-wind-integration-study-renews\/"},"modified":"2021-12-22T00:55:59","modified_gmt":"2021-12-22T05:55:59","slug":"litgrid-starts-offshore-wind-integration-study-renews","status":"publish","type":"post","link":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/offshore\/litgrid-starts-offshore-wind-integration-study-renews\/","title":{"rendered":"Litgrid starts offshore wind integration study &#8211; reNEWS"},"content":{"rendered":"<p><p>Lithuanian electricity transmission system operator Litgrid is working with Japans Tepco Power Grid on a feasibility study to assess technical and economic alternatives for offshore wind integration off Lithuania.<\/p>\n<p>The study will take into account the objectives of the National Energy Independence Strategy, which states that by 2050, 80% of Lithuania's energy demand will have to produced from non-polluting resources with 100% of the total electricity consumption in the country met by locally produced electricity.<\/p>\n<p>Development of renewable energy sources, with strong focus on the development of offshore wind, is envisaged as one of the key measures to achieve these objectives.                    <\/p>\n<p>In 2023, Lithuania plans to announce the auction for the integration of the first 700MW of offshore wind into the Lithuanian electricity system.<\/p>\n<p>The overall offshore wind potential in the territorial waters of Lithuania is up to 3.5GW.<\/p>\n<p>In order for the offshore wind integration to take place in a technologically advanced and cost-effective way, it is necessary to evaluate the possible different configurations of the grid, technical parameters, reliability of the system, the newly emerging market opportunities, plus socio-economic benefits of such projects.<\/p>\n<p>Litgrid, together with Tepco, will focus on these during the preparation of the study.<\/p>\n<p>The main conclusions of the study are planned to be published in the spring of 2022.<\/p>\n<p>This is the second study that is being prepared by Litgrid together with Tepco.<\/p>\n<p>Earlier in 2021 Tepco, together with Baltic operators, evaluated the recommendations and described the minimum requirements for generating electricity from renewable sources.<\/p>\n<p><!-- Auto Generated --><\/p>\n<p>View post:<\/p>\n<p><a target=\"_blank\" rel=\"nofollow noopener\" href=\"https:\/\/renews.biz\/74505\/litgrid-starts-offshore-wind-integration-study\/\" title=\"Litgrid starts offshore wind integration study - reNEWS\">Litgrid starts offshore wind integration study - reNEWS<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p> Lithuanian electricity transmission system operator Litgrid is working with Japans Tepco Power Grid on a feasibility study to assess technical and economic alternatives for offshore wind integration off Lithuania.  <a href=\"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/offshore\/litgrid-starts-offshore-wind-integration-study-renews\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[187814],"tags":[],"class_list":["post-1049724","post","type-post","status-publish","format-standard","hentry","category-offshore"],"_links":{"self":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts\/1049724"}],"collection":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/comments?post=1049724"}],"version-history":[{"count":0,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts\/1049724\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/media?parent=1049724"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/categories?post=1049724"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/tags?post=1049724"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}