{"id":1049708,"date":"2021-12-22T00:55:45","date_gmt":"2021-12-22T05:55:45","guid":{"rendered":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/uncategorized\/nexans-to-supply-install-moray-west-cables-offshore-oil-and-gas-magazine\/"},"modified":"2021-12-22T00:55:45","modified_gmt":"2021-12-22T05:55:45","slug":"nexans-to-supply-install-moray-west-cables-offshore-oil-and-gas-magazine","status":"publish","type":"post","link":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/offshore\/nexans-to-supply-install-moray-west-cables-offshore-oil-and-gas-magazine\/","title":{"rendered":"Nexans to supply, install Moray West cables &#8211; Offshore Oil and Gas Magazine"},"content":{"rendered":"<p><p>Offshore staff<\/p>\n<p>PARIS  Ocean  Winds has awarded Nexans  a turnkey contract to design, manufacture, install, and protect the 220-kV  subsea and onshore export cable system for the Moray West wind farm offshore northeast  Scotland. <\/p>\n<p>The cable  system consists of high voltage alternating current cabling which will connect  the wind turbines to two offshore substation platforms (OSP). The 220-kV  cabling, including 170 km (106 mi) of land cables and 100 km (62 mi) of subsea  cables, will be installed from each OSP along the full route to the project  specific onshore substation. <\/p>\n<p>The export  cabling solution will connect the projects substation to the national grid  electricity transmission system at Blackhillock, Keith.<\/p>\n<p>The cables  will be manufactured at the companys plants in Halden and Rognan, Norway,  Charleston, South Carolina, and Charleroi, Belgium, and installed by the cable  laying vessel Nexans Skagerrak. The  onshore part of the project will be overseen and delivered by the companys  personnel based in Edinburgh, Scotland.<\/p>\n<p>The 860-MW Moray  West project is fully consented. Construction is expected to start in 2022 and  be completed in 2024.<\/p>\n<p>12\/21\/2021<\/p>\n<p><!-- Auto Generated --><\/p>\n<p>Read the original here: <\/p>\n<p><a target=\"_blank\" rel=\"nofollow noopener\" href=\"https:\/\/www.offshore-mag.com\/renewable-energy\/article\/14222652\/nexans-to-supply-install-moray-west-cables-offshore-scotland\" title=\"Nexans to supply, install Moray West cables - Offshore Oil and Gas Magazine\">Nexans to supply, install Moray West cables - Offshore Oil and Gas Magazine<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p> Offshore staff PARIS Ocean Winds has awarded Nexans a turnkey contract to design, manufacture, install, and protect the 220-kV subsea and onshore export cable system for the Moray West wind farm offshore northeast Scotland. The cable system consists of high voltage alternating current cabling which will connect the wind turbines to two offshore substation platforms (OSP).  <a href=\"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/offshore\/nexans-to-supply-install-moray-west-cables-offshore-oil-and-gas-magazine\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[187814],"tags":[],"class_list":["post-1049708","post","type-post","status-publish","format-standard","hentry","category-offshore"],"_links":{"self":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts\/1049708"}],"collection":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/comments?post=1049708"}],"version-history":[{"count":0,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts\/1049708\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/media?parent=1049708"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/categories?post=1049708"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/tags?post=1049708"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}