{"id":1048916,"date":"2021-12-17T11:35:38","date_gmt":"2021-12-17T16:35:38","guid":{"rendered":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/uncategorized\/worlds-largest-offshore-wind-farm-to-start-producing-by-year-end-offshore-wind-offshore-wind\/"},"modified":"2021-12-17T11:35:38","modified_gmt":"2021-12-17T16:35:38","slug":"worlds-largest-offshore-wind-farm-to-start-producing-by-year-end-offshore-wind-offshore-wind","status":"publish","type":"post","link":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/offshore\/worlds-largest-offshore-wind-farm-to-start-producing-by-year-end-offshore-wind-offshore-wind\/","title":{"rendered":"World&#8217;s Largest Offshore Wind Farm to Start Producing by Year-End | Offshore Wind &#8211; Offshore WIND"},"content":{"rendered":"<p><p>First power from the 1,386 MW Hornsea Two, soon to be the worlds largest offshore wind farm, is expected before the end of the year, a spokesperson for rsted told offshore WIND.<\/p>\n<p>139 of the wind farms 165 Siemens Gamesa 8.4 MW wind turbines have now been installed, and all of the wind farms inter-array cables are now in place, the spokesperson said.<\/p>\n<p>Along with the 165 wind turbines, Hornsea Two also comprises an offshore substation, and a reactive compensation station (RCS).<\/p>\n<p>The wind farms transmission system is now being finalized, with the final export cable pulled into the wind farms RCS in November, according to rsteds spokesperson.<\/p>\n<p>Hornsea Two is located some 89 kilometres off the Yorkshire coast, UK. <\/p>\n<p>Spanning an offshore area of 462 square kilometres, the wind farm will go into full operation in 2022, producing enough electricity to power more than 1.3 million homes.<\/p>\n<p>DEME Offshores Sea Challenger and Sea Installer are transporting the wind farms turbines from Siemens Gamesas facilities in the Port of Hull and installing them at the project site. <\/p>\n<p>Sea Challenger installed the first turbine at the site at the end of May, and the 100th unit was installed in early October.<\/p>\n<p><!-- Auto Generated --><\/p>\n<p>More:<\/p>\n<p><a target=\"_blank\" rel=\"nofollow noopener\" href=\"https:\/\/www.offshorewind.biz\/2021\/12\/16\/worlds-largest-offshore-wind-farm-to-start-producing-by-year-end\/\" title=\"World's Largest Offshore Wind Farm to Start Producing by Year-End | Offshore Wind - Offshore WIND\">World's Largest Offshore Wind Farm to Start Producing by Year-End | Offshore Wind - Offshore WIND<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p> First power from the 1,386 MW Hornsea Two, soon to be the worlds largest offshore wind farm, is expected before the end of the year, a spokesperson for rsted told offshore WIND. 139 of the wind farms 165 Siemens Gamesa 8.4 MW wind turbines have now been installed, and all of the wind farms inter-array cables are now in place, the spokesperson said.  <a href=\"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/offshore\/worlds-largest-offshore-wind-farm-to-start-producing-by-year-end-offshore-wind-offshore-wind\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[187814],"tags":[],"class_list":["post-1048916","post","type-post","status-publish","format-standard","hentry","category-offshore"],"_links":{"self":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts\/1048916"}],"collection":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/comments?post=1048916"}],"version-history":[{"count":0,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts\/1048916\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/media?parent=1048916"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/categories?post=1048916"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/tags?post=1048916"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}