{"id":1033549,"date":"2021-10-07T15:32:19","date_gmt":"2021-10-07T19:32:19","guid":{"rendered":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/uncategorized\/get-used-to-roadwork-on-las-vegas-boulevard-las-vegas-weekly\/"},"modified":"2021-10-07T15:32:19","modified_gmt":"2021-10-07T19:32:19","slug":"get-used-to-roadwork-on-las-vegas-boulevard-las-vegas-weekly","status":"publish","type":"post","link":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/las-vegas\/get-used-to-roadwork-on-las-vegas-boulevard-las-vegas-weekly\/","title":{"rendered":"Get used to roadwork on Las Vegas Boulevard &#8211; Las Vegas Weekly"},"content":{"rendered":"<p><p>Thu, Oct 7, 2021 (2 a.m.)   <\/p>\n<p>Las Vegas Boulevard has long needed upgrades beyond simple repaving. Sidewalks need to be widened; outdated traffic signals and 50+ year-old underground utilities need replacement. Both Clark County and the City of Las Vegas are carrying out those improvements right now on a roughly four-mile stretch of the Boulevard, from Spring Mountain Road to Stewart Avenue. The new Las Vegas Boulevard will be a much easier, more attractive drivebut weve got some time until we get there.<\/p>\n<p>The City is roughly halfway through a three-year upgrade of the Boulevard from Stewart to Sahara Avenue, explains construction project manager Cassandra Watson-Mihelcic. The mainline utilitiesstorm drain, water and seweris probably about 98% complete, Watson-Mihelcic says. The next phases of work include connecting those utilities to businesses, installing new streetlights and signals, landscaping and a full pavement replacement. The project is scheduled for full completion in April 2023, though some lanes of the Boulevard are already reopening.<\/p>\n<p>The Spring Mountain-to-Sahara roadwork should be completed by the end of November, Clark County spokesperson Dan Kulin says. Remaining work includes the installation of fiber optic cables, fencing, landscaping, bollards and smart [lighting] poles. Its only the first of a seven-phase Strip improvement project, however, which will stretch as far south as the 215 Beltway, including water line replacement, upgrades to traffic signals, new pavement and more.<\/p>\n<p>In short: If you know anyone whos planning to drive the length of the Strip for whatever reason, suggest that they hold off for a couple of years.<\/p>\n<p>Experts in paleoanthropology believe that Geoff Carter began his career in journalism sometime in the early Grunge period, when he ...<\/p>\n<p><!-- Auto Generated --><\/p>\n<p>Original post:<\/p>\n<p><a target=\"_blank\" rel=\"nofollow noopener\" href=\"https:\/\/lasvegasweekly.com\/news\/2021\/oct\/07\/get-used-to-roadwork-on-las-vegas-boulevard\/\" title=\"Get used to roadwork on Las Vegas Boulevard - Las Vegas Weekly\">Get used to roadwork on Las Vegas Boulevard - Las Vegas Weekly<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p> Thu, Oct 7, 2021 (2 a.m.) Las Vegas Boulevard has long needed upgrades beyond simple repaving. Sidewalks need to be widened; outdated traffic signals and 50+ year-old underground utilities need replacement. Both Clark County and the City of Las Vegas are carrying out those improvements right now on a roughly four-mile stretch of the Boulevard, from Spring Mountain Road to Stewart Avenue <a href=\"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/las-vegas\/get-used-to-roadwork-on-las-vegas-boulevard-las-vegas-weekly\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[436511],"tags":[],"class_list":["post-1033549","post","type-post","status-publish","format-standard","hentry","category-las-vegas"],"_links":{"self":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts\/1033549"}],"collection":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/comments?post=1033549"}],"version-history":[{"count":0,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts\/1033549\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/media?parent=1033549"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/categories?post=1033549"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/tags?post=1033549"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}