{"id":1011742,"date":"2021-05-09T11:41:36","date_gmt":"2021-05-09T15:41:36","guid":{"rendered":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/south-korea-unveils-eur-27-billion-floating-wind-project-offshore-wind\/"},"modified":"2021-05-09T11:41:36","modified_gmt":"2021-05-09T15:41:36","slug":"south-korea-unveils-eur-27-billion-floating-wind-project-offshore-wind","status":"publish","type":"post","link":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/offshore\/south-korea-unveils-eur-27-billion-floating-wind-project-offshore-wind\/","title":{"rendered":"South Korea Unveils EUR 27 Billion Floating Wind Project &#8211; Offshore WIND"},"content":{"rendered":"<p><p>The Government of South Korea will invest KRW 1.4 trillion (around EUR 1 billion) in the first phase of the project to develop a 6 GW floating wind farm offshore Ulsan, the countrys president Moon Jae-in said.<\/p>\n<p>The mammoth project will need a public-private investment of some KRW 36 trillion (EUR 26.7 billion), with the full commissioning expected in 2030. <\/p>\n<p>Some 20 per cent of the electricity produced at the wind farm could be used to produce around 84,000 tons of hydrogen per year, Moon said.<\/p>\n<p>This one project alone would meet half of the countrys offshore wind capacity target by 2030.<\/p>\n<p>The project is expected to create 210,000 jobs, Moon said.<\/p>\n<p>The 6 GW wind farm will be built at the site of the Donghae 1 gas field which is scheduled to end production in 2022.<\/p>\n<p>Located some 58 kilometres off Ulsan, the site has already been selected by Korea National Oil Corporation (KNOC), Korea East-West Power (EWP), and Equinor for the development of the 200 MW Donghae 1 demonstration floating wind farm.<\/p>\n<p>A portion of the power produced at Donghae 1 will be used to power a 100 MW electrolyser plant being developed under a different project.<\/p>\n<p>As big as this 6 GW floating wind farm is, it is still not the largest offshore wind project announced in South Korea. <\/p>\n<p>Back in February, the country launched a KRW 48.5 trillion project to build an 8.2 GW fixed-bottom offshore wind farm off the Sinan County, South Jeolla Province, by 2030.<\/p>\n<p>If both of these projects are fully built, South Korea will blow past its target of having 12 GW of installed offshore wind capacity by 2030.<\/p>\n<p><!-- Auto Generated --><\/p>\n<p>More:<\/p>\n<p><a target=\"_blank\" rel=\"nofollow noopener\" href=\"https:\/\/www.offshorewind.biz\/2021\/05\/07\/south-korea-unveils-eur-27-billion-floating-wind-project\/\" title=\"South Korea Unveils EUR 27 Billion Floating Wind Project - Offshore WIND\">South Korea Unveils EUR 27 Billion Floating Wind Project - Offshore WIND<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p> The Government of South Korea will invest KRW 1.4 trillion (around EUR 1 billion) in the first phase of the project to develop a 6 GW floating wind farm offshore Ulsan, the countrys president Moon Jae-in said. The mammoth project will need a public-private investment of some KRW 36 trillion (EUR 26.7 billion), with the full commissioning expected in 2030.  <a href=\"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/offshore\/south-korea-unveils-eur-27-billion-floating-wind-project-offshore-wind\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[187814],"tags":[],"class_list":["post-1011742","post","type-post","status-publish","format-standard","hentry","category-offshore"],"_links":{"self":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts\/1011742"}],"collection":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/comments?post=1011742"}],"version-history":[{"count":0,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts\/1011742\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/media?parent=1011742"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/categories?post=1011742"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/tags?post=1011742"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}