{"id":1007893,"date":"2021-04-11T06:05:15","date_gmt":"2021-04-11T10:05:15","guid":{"rendered":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/kriegers-flak-wind-turbine-installation-reaches-halfway-mark-offshore-denmark-offshore-oil-and-gas-magazine\/"},"modified":"2021-04-11T06:05:15","modified_gmt":"2021-04-11T10:05:15","slug":"kriegers-flak-wind-turbine-installation-reaches-halfway-mark-offshore-denmark-offshore-oil-and-gas-magazine","status":"publish","type":"post","link":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/offshore\/kriegers-flak-wind-turbine-installation-reaches-halfway-mark-offshore-denmark-offshore-oil-and-gas-magazine\/","title":{"rendered":"Kriegers Flak wind turbine installation reaches halfway mark offshore Denmark &#8211; Offshore Oil and Gas Magazine"},"content":{"rendered":"<p><p>The jackup vessel Vole au vent at the Kriegers Flak wind farm offshore eastern Denmark.<\/p>\n<p>(Courtesy Jan De Nul)<\/p>\n<p>Offshore staff<\/p>\n<p>AALST, Belgium  Jan  De Nul Groups jackup vessel Vole au  vent has installed 36 of the 72 turbines for Vattenfalls Kriegers  Flak offshore wind farm in the Danish sector of the Baltic Sea.<\/p>\n<p>The first Siemens  Gamesa 8.0-167 DD wind turbine was installed on Jan. 27, 2021. The last turbine  is scheduled to be installed in mid-June.<\/p>\n<p>For the  first time since its expansion in 2018, the port of Roenne on the Danish island  of Bornholm is serving as marshalling harbor for the construction of an  offshore wind farm.<\/p>\n<p>Bert  Reynvoet, Project Manager for the Kriegers  Flak offshore wind farm, said: When a large installation vessel like the Vole  au vent enters a port for the first time, it is always a bit exciting.  Moreover, it was new for everyone involved, but thanks to the top service of  the port and our local partners, Roenne turns out to be a perfect marshalling  harbor. An absolute boost in these challenging times.<\/p>\n<p>In 2017 and  2018, Jan De Nul Group designed, built, and installed two gravity-based foundations  for the wind farms high-voltage substations. Its crane vessel Rambiz installed the 8,000- and 10,000-metric  ton concrete structures.<\/p>\n<p>Located  15-40 km (9.3-25 mi) off the Danish east coast, the 600-MW Kriegers Flak  offshore wind farm is expected to be fully operational by the end of the year.  It is expected to provide the annual electricity needs of about 600,000 Danish  households.<\/p>\n<p>04\/08\/2021<\/p>\n<p><!-- Auto Generated --><\/p>\n<p>More here:<\/p>\n<p><a target=\"_blank\" rel=\"nofollow noopener\" href=\"https:\/\/www.offshore-mag.com\/renewable-energy\/article\/14201012\/kriegers-flak-wind-turbine-installation-reaches-halfway-mark-offshore-denmark\" title=\"Kriegers Flak wind turbine installation reaches halfway mark offshore Denmark - Offshore Oil and Gas Magazine\">Kriegers Flak wind turbine installation reaches halfway mark offshore Denmark - Offshore Oil and Gas Magazine<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p> The jackup vessel Vole au vent at the Kriegers Flak wind farm offshore eastern Denmark. (Courtesy Jan De Nul) Offshore staff AALST, Belgium Jan De Nul Groups jackup vessel Vole au vent has installed 36 of the 72 turbines for Vattenfalls Kriegers Flak offshore wind farm in the Danish sector of the Baltic Sea <a href=\"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/offshore\/kriegers-flak-wind-turbine-installation-reaches-halfway-mark-offshore-denmark-offshore-oil-and-gas-magazine\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[187814],"tags":[],"class_list":["post-1007893","post","type-post","status-publish","format-standard","hentry","category-offshore"],"_links":{"self":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts\/1007893"}],"collection":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/comments?post=1007893"}],"version-history":[{"count":0,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/posts\/1007893\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/media?parent=1007893"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/categories?post=1007893"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.euvolution.com\/prometheism-transhumanism-posthumanism\/wp-json\/wp\/v2\/tags?post=1007893"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}