{"id":81984,"date":"2013-05-31T15:49:54","date_gmt":"2013-05-31T19:49:54","guid":{"rendered":"http:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/uncategorized\/army-corps-will-use-hundreds-of-millions-to-restore-beaches-in-south-jersey.php"},"modified":"2013-05-31T15:49:54","modified_gmt":"2013-05-31T19:49:54","slug":"army-corps-will-use-hundreds-of-millions-to-restore-beaches-in-south-jersey","status":"publish","type":"post","link":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/beaches\/army-corps-will-use-hundreds-of-millions-to-restore-beaches-in-south-jersey.php","title":{"rendered":"Army Corps will use hundreds of millions to restore beaches in South Jersey"},"content":{"rendered":"<p><p>    PLEASANTVILLE, N.J.  Wider beaches and protective dunes are    closer to reality for those South Jersey beach towns that have    not previously had projects built by the U.S. Army Corps of    Engineers.  <\/p>\n<p>    In its second report to Congress detailing how it will spend    its roughly $5 billion allotment of Hurricane Sandy disaster    aid, the Army Corps said it plans to use hundreds of millions    of dollars to restore beaches for the first time in Ship    Bottom, Beach Haven and Long Beach Township, other than Brant    Beach. Margate, Longport, the south end of Ocean City,    Strathmere and Sea Isle City also are included.  <\/p>\n<p>    There is no timeline for how and when the projects will be    built because there still are numerous decisions that have to    be finalized, said Ed Voigt, spokesman for the Army Corps of    Engineers, Philadelphia District.  <\/p>\n<p>    Projects on the list also include constructing a seawall along    Absecon Inlet in Atlantic City, Voigt said. From an engineers    standpoint, that project is really ready to go.  <\/p>\n<p>    The projects in south Ocean City, Strathmere and Sea Isle City    had been designed in the 1990s and did not include dunes, but    Voigt said corps policy now requires dunes and wider beaches.  <\/p>\n<p>    When we build south Ocean City, Strathmere and Sea Isle City,    that project will include a dune, Voigt said.  <\/p>\n<p>    The report lists 18 projects that have been designed and    approved, but have not been built. It estimates the total cost    of building the projects in Delaware, New Jersey, New York and    Virginia to be more than $2.1 billion. Projects for South    Jersey are estimated to cost about $180 million. Voigt said the    estimates may change significantly, either up or down, as    construction costs become more clear.  <\/p>\n<p>    This is important news for our region, for our tourism-based    economy and for the countless businesses and jobs that depend    on the beaches of the Jersey Shore for their livelihood, U.S.    Rep. Frank LoBiondo, R-2 said in a news release.  <\/p>\n<p>    Earlier this year, the Army Corps began putting sand back on    numerous beaches in South Jersey to repair damage to the beach    width and dunes that happened during Sandy and Tropical Storm    Irene in 2011. Work has been nearly completed in Stone Harbor,    while work was completed earlier this year in Avalon and    Brigantine and on Tuesday in Ocean Citys north end. Work is    expected to begin in the coming weeks for Brant Beach and    Harvey Cedars on Long Beach Island, Atlantic City and Ventnor    and work will begin in the fall in Cape May.  <\/p>\n<p>    We knew this was going to come, we just hoped it would have    come a month earlier, Ocean City Mayor Jay Gillian said about    the latest Army Corps plans during the City Councils meeting    Thursday night.  <\/p>\n<p><!-- Auto Generated --><\/p>\n<p>See more here:<\/p>\n<p><a target=\"_blank\" href=\"http:\/\/www.stripes.com\/news\/us\/army-corps-will-use-hundreds-of-millions-to-restore-beaches-in-south-jersey-1.223795\" title=\"Army Corps will use hundreds of millions to restore beaches in South Jersey\">Army Corps will use hundreds of millions to restore beaches in South Jersey<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p> PLEASANTVILLE, N.J.  <a href=\"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/beaches\/army-corps-will-use-hundreds-of-millions-to-restore-beaches-in-south-jersey.php\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"limit_modified_date":"","last_modified_date":"","_lmt_disableupdate":"","_lmt_disable":"","footnotes":""},"categories":[39],"tags":[],"class_list":["post-81984","post","type-post","status-publish","format-standard","hentry","category-beaches"],"modified_by":null,"_links":{"self":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/81984"}],"collection":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/comments?post=81984"}],"version-history":[{"count":0,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/81984\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/media?parent=81984"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/categories?post=81984"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/tags?post=81984"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}