{"id":64759,"date":"2012-12-13T09:53:49","date_gmt":"2012-12-13T09:53:49","guid":{"rendered":"http:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/uncategorized\/ameresco-completes-first-phase-of-energy-savings-program-with-nasa-wallops-flight-facility.php"},"modified":"2012-12-13T09:53:49","modified_gmt":"2012-12-13T09:53:49","slug":"ameresco-completes-first-phase-of-energy-savings-program-with-nasa-wallops-flight-facility","status":"publish","type":"post","link":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/space-flight\/ameresco-completes-first-phase-of-energy-savings-program-with-nasa-wallops-flight-facility.php","title":{"rendered":"Ameresco Completes First Phase of Energy Savings Program with NASA Wallops Flight Facility"},"content":{"rendered":"<p><p>    FRAMINGHAM, Mass. & WALLOPS ISLAND, Va.--(BUSINESS WIRE)--  <\/p>\n<p>        Ameresco, Inc. (AMRC),    a leading energy efficiency and renewable energy company, today    announced the completion of the first phase of a $28 million    energy savings project with NASA Goddard Space Flight Centers    Wallops Flight Facility, located on Virginias eastern shore.    The Wallops Flight Facility is NASAs principal facility for    the management and implementation of suborbital research    programs. As part of the $15 million first phase of the    facility-wide project, Ameresco installed high efficiency    lighting, decentralized an antiquated steam plant by installing    a propane distribution system with over 60 building-level    condensing boilers, and upgraded and expanded an existing    energy management control system (EMCS).  <\/p>\n<p>    Performed under the Department of Energy (DOE) Energy Savings    Performance Contract (ESPC) Program, which is under one of    Amerescos federal indefinite delivery\/indefinite quantity    (IDIQ) contracting vehicles, the first phase is projected to    reduce energy intensity by 35 percent. To support the Wallops    Mission Plan and NASAs overall effort to reduce energy    consumption and improve aging infrastructure, Ameresco is    currently engaged in building and deploying a $13 million    second phase to the energy savings project. The scope includes    a geothermal energy efficiency project at the site that is    projected for completion in 2013.  <\/p>\n<p>    The energy savings performance contract with Ameresco brought    major improvements to Wallops Flight Facility, said Philip    Smith, Energy Manager for the Wallops Flight Facility.    Financed entirely by energy conservation, the project has    additional side-benefits in operations and maintenance cost    savings, air emissions reduction, fuel tank compliance, and    water conservation savings. This effort will single-handedly    satisfy Wallops federal energy reduction requirements beyond    the horizon of all existing legislation and it contributes    significantly to help to refresh aging infrastructure.  <\/p>\n<p>    During the first phase of the energy savings program, Ameresco    worked with Wallops to replace the central plant fuel-oil fired    boilers with high-efficiency, propane-fired condensing boilers    while installing over five miles of new underground propane gas    piping. As part of the ESPC, more than 9,950 interior and    exterior lighting fixtures were replaced with higher efficiency    units and technologies. Ameresco also upgraded and expanded the    existing energy management control system in 14 buildings and    interconnected newly installed gas meters to the EMCS.  <\/p>\n<p>    We are proud and enthusiastic about the completion of the    first phase of this energy savings project, the current    geothermal project, and our teams continuous ability to    incorporate innovative technologies and financing in order to    meet our clients needs, said Keith Derrington, Executive Vice    President of Ameresco. The support and cooperation from NASA    Goddard Space Flight Centers Acquisition\/Contracting Office    and the Wallops Flight Facilitys management ultimately made    this project successful at transforming their energy    infrastructure and supporting their initiatives to reduce    emissions.  <\/p>\n<p>    As part of its ESPC work with Ameresco, Wallops is expected to    save over 77,000 million BTUs a year. In addition, greenhouse    gas emissions are expected to be reduced by more than 8,600    metric tons, which is equivalent to the GHG emissions of    approximately 1,700 passenger vehicles.  <\/p>\n<p>    As a prequalified energy services company (ESCO) for government    energy conservation programs within the DOE and Department of    Defense, Ameresco has a proven track record of working with    federal organizations to design, build and, in many cases,    operate and manage energy projects financed through an ESPC.    Ameresco develops energy projects that eliminate the need for    significant taxpayer funding by sourcing financing through cost    savings generated by increased energy efficiency.  <\/p>\n<p>    About Ameresco, Inc.  <\/p>\n<p>    Founded in 2000, Ameresco, Inc. (AMRC)    is a leading independent provider of comprehensive services,    energy efficiency, infrastructure upgrades, asset    sustainability and renewable energy solutions for facilities    throughout North America. Amerescos services include upgrades    to a facilitys energy infrastructure and the development,    construction and operation of renewable energy plants. Ameresco    has successfully completed energy saving, environmentally    responsible projects with federal, state and local governments,    healthcare and educational institutions, housing authorities,    and commercial and industrial customers. With its corporate    headquarters in Framingham, MA, Ameresco provides local    expertise through its 63 offices in 34 states and five Canadian    provinces. Ameresco has more than 900 employees. For more    information, visit     <a href=\"http:\/\/www.ameresco.com\" rel=\"nofollow\">http:\/\/www.ameresco.com<\/a>.  <\/p>\n<p><!-- Auto Generated --><\/p>\n<p>Follow this link:<\/p>\n<p><a target=\"_blank\" href=\"http:\/\/finance.yahoo.com\/news\/ameresco-completes-first-phase-energy-150000940.html;_ylt=A2KJjamnpclQth4AquP_wgt.\" title=\"Ameresco Completes First Phase of Energy Savings Program with NASA Wallops Flight Facility\">Ameresco Completes First Phase of Energy Savings Program with NASA Wallops Flight Facility<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p> FRAMINGHAM, Mass.  <a href=\"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/space-flight\/ameresco-completes-first-phase-of-energy-savings-program-with-nasa-wallops-flight-facility.php\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"limit_modified_date":"","last_modified_date":"","_lmt_disableupdate":"","_lmt_disable":"","footnotes":""},"categories":[18],"tags":[],"class_list":["post-64759","post","type-post","status-publish","format-standard","hentry","category-space-flight"],"modified_by":null,"_links":{"self":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/64759"}],"collection":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/comments?post=64759"}],"version-history":[{"count":0,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/64759\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/media?parent=64759"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/categories?post=64759"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/tags?post=64759"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}