{"id":52727,"date":"2012-09-18T04:16:08","date_gmt":"2012-09-18T04:16:08","guid":{"rendered":"http:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/uncategorized\/no-human-space-flight-for-india-before-2017-isro.php"},"modified":"2012-09-18T04:16:08","modified_gmt":"2012-09-18T04:16:08","slug":"no-human-space-flight-for-india-before-2017-isro","status":"publish","type":"post","link":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/space-flight\/no-human-space-flight-for-india-before-2017-isro.php","title":{"rendered":"No human space flight for India before 2017: ISRO"},"content":{"rendered":"<p><p>    India [ Images ] will not    undertake a human space flight before the year 2017 and is    likely to use a next-generation rocket for the ambitious    mission, the cost of which would be reworked, Chairman of    Indian Space Research Organisation, K Radhakrishnan said on    Monday.  <\/p>\n<p>    Radhakrishnan, also Department of Space Secretary    and Space Commission Chairman, confirmed that the    venture is not part of the 12th five-year plan (2012-2017) but    said there are funds to continue with pre-project studies and    develop critical technologies associated with the proposed    mission.  <\/p>\n<p>    ISRO officials noted that the space agency currently does    not have an operational GSLV, after two unsuccessful missions,    one with Indian cryogenic engine and another with the imported    Russian one in 2010.  <\/p>\n<p>    Radhakrishnan said GSLV with indigenous cryogenic engine    and stage would be flight-tested in January-February next    year.  <\/p>\n<p>    \"If you look at the scenario today, we do not have a    programme (human space flight) declared as such (yet to    get Cabinet approval)\", he told reporters in    response to questions.  <\/p>\n<p>    ISRO's proposed human space flight programme was much    talked about in the second half of the last decade but the    twin-failures of the GSLV has saw to it that it lost    momentum.  <\/p>\n<p>    In 2008-09, it was estimated that a sum of Rs 12,400    crore would be required for undertaking the mission. \"We need    to rework (on that figure)\", Radhakrishnan said.  <\/p>\n<p>    GSLV-Mk II (rocket) was proposed to be used for the    mission then, but Radhakrishnan said it would be able to carry    a two-member crew only, while GSLV-Mk III which is under    development would have additional mass left for conducting    scientific experiments besides a two-member crew.  <\/p>\n<p>    \"We feel it (GSLV-Mk III) would be a better vehicle (for    the mission)\", he said.  <\/p>\n<p>    Radhakrishnan, however, said ISRO already has a budget    of Rs 150 crore for conducting pre-project studies    and developing critical technologies including environmental    control, space suit, reentry and crew escape system. The rocket    must have man-rating, he noted.  <\/p>\n<\/p>\n<p>Read more here: <\/p>\n<p><a target=\"_blank\" href=\"http:\/\/www.rediff.com\/news\/report\/no-human-space-flight-for-india-before-2017-isro\/20120917.htm\" title=\"No human space flight for India before 2017: ISRO\">No human space flight for India before 2017: ISRO<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p> India [ Images ] will not undertake a human space flight before the year 2017 and is likely to use a next-generation rocket for the ambitious mission, the cost of which would be reworked, Chairman of Indian Space Research Organisation, K Radhakrishnan said on Monday.  <a href=\"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/space-flight\/no-human-space-flight-for-india-before-2017-isro.php\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"limit_modified_date":"","last_modified_date":"","_lmt_disableupdate":"","_lmt_disable":"","footnotes":""},"categories":[18],"tags":[],"class_list":["post-52727","post","type-post","status-publish","format-standard","hentry","category-space-flight"],"modified_by":null,"_links":{"self":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/52727"}],"collection":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/comments?post=52727"}],"version-history":[{"count":0,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/52727\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/media?parent=52727"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/categories?post=52727"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/tags?post=52727"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}