{"id":51563,"date":"2012-08-23T14:16:18","date_gmt":"2012-08-23T14:16:18","guid":{"rendered":"http:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/uncategorized\/liberty-mines-announces-positive-preliminary-economic-assessment-on-its-hart-nickel-project.php"},"modified":"2012-08-23T14:16:18","modified_gmt":"2012-08-23T14:16:18","slug":"liberty-mines-announces-positive-preliminary-economic-assessment-on-its-hart-nickel-project","status":"publish","type":"post","link":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/liberty\/liberty-mines-announces-positive-preliminary-economic-assessment-on-its-hart-nickel-project.php","title":{"rendered":"Liberty Mines Announces Positive Preliminary Economic Assessment on its Hart Nickel Project"},"content":{"rendered":"<p><p>    TSX: LBE  <\/p>\n<p>    TORONTO , Aug. 23, 2012 \/CNW\/ - Liberty Mines Inc. (LBE.TO)    (\"Liberty\" or the \"Company\") today announced that a positive    preliminary economic assessment has been completed for its Hart    Project, a nickel deposit located in Timmins Ontario, and    approximately five kilometers from the Company's Redstone    mill. The preliminary economic assessment was prepared by    Stantec Consulting. All dollar amounts are in Canadian    currency. A final version of the Preliminary Economic    Assessment will be filed on SEDAR within 45 days as required.  <\/p>\n<p>    Preliminary Economic Assessment Study Highlights  <\/p>\n<p>    \"We are very encouraged by the positive results of the    Preliminary Economic Assessment and our prospects for the Hart    Project,\" said Chris Stewart , President and CEO of Liberty    Mines Inc. \"The PEA suggests that the Hart Project has    the potential to become economically viable, generate positive    cash flow, and take advantage of the available capacity at our    Redstone Mill. Recent drill results, although preliminary    at this time, also suggest that the deposit has the potential    for mineralization expansion at depth and stronger economics.\"  <\/p>\n<p>    Mr. Stewart added, \"With the only operating mill in the Shaw    Dome Region, a large land package that includes the Hart East    Deposit whose initial drill results demonstrated the potential    for a significant mineralized zone, as well as the opportunity    for property consolidation in the region, we believe that    Liberty's prospects are extremely strong over the long term,    particularly as the price of nickel recovers.\"  <\/p>\n<p>    Hart Project Description    The Hart Project will be a stand-alone underground mine used    for the extraction of nickel ore, and will share synergies with    Liberty's existing assets and facilities.    Underground production will be done primarily via long-hole    mining and transported to surface using diesel    trucks. The Hart Mine is expected to produce    an average of 750 tonnes of nickel ore per day throughout its 8    year life of mine.  <\/p>\n<p>    The Preliminary Economic Assessment assumes that construction    of the mine will begin in 2013 and will reach a steady rate of    production by 2017.  <\/p>\n<p>    To see an image of the Hart & Hart East projects, click the    following link:     <a href=\"http:\/\/files.newswire.ca\/1063\/Hart_Hart_East.pdf\" rel=\"nofollow\">http:\/\/files.newswire.ca\/1063\/Hart_Hart_East.pdf<\/a>  <\/p>\n<p>    Summary of the Hart Project Mineral Resource    Estimate    The Preliminary Economic Assessment was based on resource    estimates prepared by SRK Consulting ( Canada ) Inc. according    to NI43-101 standards and filed as a technical report on the    property on March 4, 2010 summarized as follows:  <\/p>\n<p>    Table 1: Hart 2010 Resource Estimate Summary:  <\/p>\n<\/p>\n<p>View original post here:<\/p>\n<p><a target=\"_blank\" href=\"http:\/\/finance.yahoo.com\/news\/liberty-mines-announces-positive-preliminary-110000757.html;_ylt=A2KLOzEmOzZQpiMAY7P_wgt.\" title=\"Liberty Mines Announces Positive Preliminary Economic Assessment on its Hart Nickel Project\">Liberty Mines Announces Positive Preliminary Economic Assessment on its Hart Nickel Project<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p> TSX: LBE TORONTO , Aug. 23, 2012 \/CNW\/ - Liberty Mines Inc <a href=\"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/liberty\/liberty-mines-announces-positive-preliminary-economic-assessment-on-its-hart-nickel-project.php\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"limit_modified_date":"","last_modified_date":"","_lmt_disableupdate":"","_lmt_disable":"","footnotes":""},"categories":[29],"tags":[],"class_list":["post-51563","post","type-post","status-publish","format-standard","hentry","category-liberty"],"modified_by":null,"_links":{"self":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/51563"}],"collection":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/comments?post=51563"}],"version-history":[{"count":0,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/51563\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/media?parent=51563"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/categories?post=51563"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/tags?post=51563"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}