{"id":46049,"date":"2012-05-31T23:28:34","date_gmt":"2012-05-31T23:28:34","guid":{"rendered":"http:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/uncategorized\/boeing-delivers-1st-space-launch-system-hardware-to-nasa.php"},"modified":"2012-05-31T23:28:34","modified_gmt":"2012-05-31T23:28:34","slug":"boeing-delivers-1st-space-launch-system-hardware-to-nasa","status":"publish","type":"post","link":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/nasa\/boeing-delivers-1st-space-launch-system-hardware-to-nasa.php","title":{"rendered":"Boeing Delivers 1st Space Launch System Hardware to NASA"},"content":{"rendered":"<p><p>    HUNTSVILLE, Ala., May 31, 2012 \/PRNewswire\/ -- The Boeing Company    (BA)    has delivered NASA three flight computer software test beds,    the first critical element for flight software development in    support of NASA's Space Launch System (SLS). Flight software controls the    launch vehicle during preflight tanking operations and in    flight.  <\/p>\n<p>    The test beds were delivered on April 25, ahead of schedule, to    the Software Development Facility at NASA's Marshall Space    Flight Center in Huntsville. They are now being integrated with    NASA's application software.  <\/p>\n<p>    \"These are the most capable flight computers ever developed for    human spaceflight,\" said Dane Richardson, manager for the    Boeing SLS Avionics and Software Team. \"They have the highest    processing capability available in a flight computer and triple modular    redundant processors. The technology is proven from years of    satellite applications, and it's reliable enough to take SLS    beyond Earth's orbit.\"  <\/p>\n<p>    In triple modular redundant processing, three processors within    each flight computer interpret the data, then \"vote\" to be sure    they all agree on the response before sending that solution    from the computer. The three flight computers on the vehicle    then compare those answers and send commands to the vehicle for    execution.  <\/p>\n<p>    \"The triple redundant processors make each computer reliable in    the harsh radiation environment. Similarly, the three computers    working in concert make the vehicle reliable,\" explained    Richardson. \"The configuration is called the flight computer    operating group.\"  <\/p>\n<p>    \"Delivering NASA the flight computer software test beds early    gives them more time to develop the most capable flight    software for SLS,\" said Jim Chilton, vice president for Boeing    Exploration Launch Systems and SLS program manager. \"The Boeing    SLS avionics team will continue to work closely with NASA to    ensure seamless integration of NASA software and the Boeing    hardware and operating system as we move forward in rocket    design and development.\"  <\/p>\n<p>    In 2011, NASA executed a contract modification that changed    existing Upper Stage Production and Instrument Unit Avionics    contracts into a single contract for design, development and    production of the cryogenic stages and avionics for SLS.  <\/p>\n<p>    SLS will provide an entirely new capability for human    exploration beyond Earth orbit. With its ability to conduct    both crew and cargo missions, it also will back up commercial    and international-partner transportation services to the    International Space Station.  <\/p>\n<p>    Under NASA's phased development plan for SLS, Boeing is    designing the two cryogenic stages concurrently to maximize the    affordability of rocket development and operations. The initial    flight-test configuration, scheduled to fly in 2017, will    provide a 70-metric ton capacity using only the first stage.    The complete two-stage vehicle configuration will provide a    lift capability of more than 130 metric tons to enable missions    beyond Earth orbit and support deep space exploration.  <\/p>\n<p>    Visit <a href=\"http:\/\/www.beyondearth.com\" rel=\"nofollow\">http:\/\/www.beyondearth.com<\/a> for more information    about the future of human space exploration.  <\/p>\n<\/p>\n<p>View post:<\/p>\n<p><a target=\"_blank\" href=\"http:\/\/finance.yahoo.com\/news\/boeing-delivers-1st-space-launch-193800432.html;_ylt=A2KJjamQ_sdPRx8Avcn_wgt.\" title=\"Boeing Delivers 1st Space Launch System Hardware to NASA\">Boeing Delivers 1st Space Launch System Hardware to NASA<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p> HUNTSVILLE, Ala., May 31, 2012 \/PRNewswire\/ -- The Boeing Company (BA) has delivered NASA three flight computer software test beds, the first critical element for flight software development in support of NASA's Space Launch System (SLS). Flight software controls the launch vehicle during preflight tanking operations and in flight. The test beds were delivered on April 25, ahead of schedule, to the Software Development Facility at NASA's Marshall Space Flight Center in Huntsville.  <a href=\"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/nasa\/boeing-delivers-1st-space-launch-system-hardware-to-nasa.php\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"limit_modified_date":"","last_modified_date":"","_lmt_disableupdate":"","_lmt_disable":"","footnotes":""},"categories":[20],"tags":[],"class_list":["post-46049","post","type-post","status-publish","format-standard","hentry","category-nasa"],"modified_by":null,"_links":{"self":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/46049"}],"collection":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/comments?post=46049"}],"version-history":[{"count":0,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/46049\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/media?parent=46049"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/categories?post=46049"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/tags?post=46049"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}