{"id":45386,"date":"2012-05-25T18:24:24","date_gmt":"2012-05-25T18:24:24","guid":{"rendered":"http:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/uncategorized\/eco-wave-power-successfully-installed-its-first-fully-operational-wave-energy-power-plant.php"},"modified":"2012-05-25T18:24:24","modified_gmt":"2012-05-25T18:24:24","slug":"eco-wave-power-successfully-installed-its-first-fully-operational-wave-energy-power-plant","status":"publish","type":"post","link":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/eco-system\/eco-wave-power-successfully-installed-its-first-fully-operational-wave-energy-power-plant.php","title":{"rendered":"Eco Wave Power Successfully Installed its First Fully Operational Wave Energy Power Plant"},"content":{"rendered":"<p><p>    TEL AVIV, Israel, May 24, 2012 \/PRNewswire\/ --  <\/p>\n<p>    ** Eco Wave Power's Medium-Scale Wave Energy Generation System,    is successfully operated in the Black Sea.  <\/p>\n<p>    Eco Wave Power has successfully installed a medium-scale wave    energy power plant, in the Black Sea, during the month of    April, 2012. The installation of EWP's system, took place    during that month in recognition of the international Mother    Earth Day, celebrated in more than 175 countries every year.  <\/p>\n<p>    A video of the testing is available    at:<a href=\"http:\/\/www.youtube.com\/watch?v=nCNz-QW3JYY&#038;feature=youtu.be\" rel=\"nofollow\">http:\/\/www.youtube.com\/watch?v=nCNz-QW3JYY&#038;feature=youtu.be<\/a>  <\/p>\n<p>    The Black Sea providedEco Wave Powerwith real-life    conditions necessary for the testing of EWP's wave energy    devices under uncontrolled wave heights and wave periods.  <\/p>\n<p>    Among the different tests, Eco Wave Power has examined the    characteristics of 2 different floaters shapes, the \"Wave    Clapper\" and the \"Power Wing\", and also performed the measuring    of the KW output in different wave heights and periods,    measuring the influence of side waves on the floaters and the    connections, connecting the floaters to electric devices and    showing an electricity supply(with and without an    accumulator), examining the influence of floaters in proximity    to each other, examining the option to unite both floaters to    one electric grid and charge a common accumulator, as well as    -examining the floaters' storm-protection Mechanisms.  <\/p>\n<p>    On the 18th and 19th of April the Black    Sea has experienced stormy conditions. During which, Eco Wave    Power has decided to stress-test its floaters. Consequently,    Eco Wave Power had operated its floaters, at a wave height of    up to 5 meters. The results were astonishing. Eco Wave Power's    floaters had survived the storm, without damages.  <\/p>\n<p>    In addition, Eco Wave Power had concluded that 2 medium-scale    wave energy devices are sufficient for the production of    electricity for 6 to 10 households. Now, Imagine what a hundred    commercial scale floaters could do.  <\/p>\n<p>    The next phase of EWP will be to move the medium-scale power    plant to a different coastal structure, in order to show our    potential clients that EWP's wave energy generation system can    be easily connected to almost any ocean structure. After    this, EWP will build its first commercial scale Sea Wave Power    Plant, and reveal the construction and production prices, this    will be cheaper than any other renewable or traditional energy    generation system.  <\/p>\n<p>    David Leb, Founder, stated that \"Eco Wave Power is aware of the    impact that pollution has on the world. According to a Cornell    study, about 40 percent of deaths worldwide are caused by    water, air and soil pollution. Such environmental degradation,    coupled with the growth in world population, are major causes    behind the rapid increase in human diseases. Both factors    contribute to the malnourishment and disease susceptibility of    3.7 billion people. EWP wants to prove that there is another    way for energy generation. The clean way is the right way for    the world.\"  <\/p>\n<\/p>\n<p>Visit link: <\/p>\n<p><a target=\"_blank\" href=\"http:\/\/finance.yahoo.com\/news\/eco-wave-power-successfully-installed-110000089.html;_ylt=A2KJjbxQzr9PQ1MAdpP_wgt.\" title=\"Eco Wave Power Successfully Installed its First Fully Operational Wave Energy Power Plant\">Eco Wave Power Successfully Installed its First Fully Operational Wave Energy Power Plant<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p> TEL AVIV, Israel, May 24, 2012 \/PRNewswire\/ -- ** Eco Wave Power's Medium-Scale Wave Energy Generation System, is successfully operated in the Black Sea. Eco Wave Power has successfully installed a medium-scale wave energy power plant, in the Black Sea, during the month of April, 2012. The installation of EWP's system, took place during that month in recognition of the international Mother Earth Day, celebrated in more than 175 countries every year <a href=\"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/eco-system\/eco-wave-power-successfully-installed-its-first-fully-operational-wave-energy-power-plant.php\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"limit_modified_date":"","last_modified_date":"","_lmt_disableupdate":"","_lmt_disable":"","footnotes":""},"categories":[33],"tags":[],"class_list":["post-45386","post","type-post","status-publish","format-standard","hentry","category-eco-system"],"modified_by":null,"_links":{"self":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/45386"}],"collection":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/comments?post=45386"}],"version-history":[{"count":0,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/45386\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/media?parent=45386"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/categories?post=45386"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/tags?post=45386"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}