{"id":446977,"date":"2020-10-29T08:56:20","date_gmt":"2020-10-29T12:56:20","guid":{"rendered":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/uncategorized\/ferrovial-to-construct-demosath-floating-offshore-wind-platform-offshore-oil-and-gas-magazine.php"},"modified":"2020-10-29T08:56:20","modified_gmt":"2020-10-29T12:56:20","slug":"ferrovial-to-construct-demosath-floating-offshore-wind-platform-offshore-oil-and-gas-magazine","status":"publish","type":"post","link":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/offshore\/ferrovial-to-construct-demosath-floating-offshore-wind-platform-offshore-oil-and-gas-magazine.php","title":{"rendered":"Ferrovial to construct DemoSATH floating offshore wind platform &#8211; Offshore Oil and Gas Magazine"},"content":{"rendered":"<p><p>(Courtesy Saitec Offshore Technologies)<\/p>\n<p>Offshore staff<\/p>\n<p>BILBAO, Spain  Saitec Offshore Technologies  and RWE Renewables have selected Ferrovial to manufacture and assemble the SATH  floating platform in the DemoSATH  project.<\/p>\n<p>The  construction package is expected to last 14 months and covers site preparation,  concrete precasting, procurement of steel bulkheads, and assembly of the  floater along with management of the supply chain.<\/p>\n<p>The DemoSATH  project will deploy the first multi-megawatt floating  offshore wind turbine connected to the Spanish grid. <\/p>\n<p>The SATH  Technology floater is based on a twin hull, made of modularly prefabricated and  subsequently braced concrete elements. According to Saitec, it can align itself  around a single point of mooring depending to the wind and wave direction. <\/p>\n<p>For the  prototype, the structure and the 2-MW wind turbine will be assembled in the  port of Bilbao. The base of the structure will be about 30 m (98 ft) wide and 64  m (210 ft) long. The platform, including the turbine, will be towed to its  anchorage point in a test field (BIMEP) 3 km (2 mi) off the coast at a depth of  85 m (279 ft). Hybrid mooring lines, composed by chains and fiber, anchored to  the seabed will hold the floating body in position.<\/p>\n<p>The unit is  expected to go into operation early 2022. The power generated by DemoSATH is  expected to provide enough annual electricity to meet the power needs for 2,000  homes and prevent emissions of more than 5,100 tons of CO2 into the  atmosphere.<\/p>\n<p>The  objective of the project is to collect data and gain real-life knowledge from  the construction, operation, and maintenance of the unit, according to Saitec. It  will test the offshore behavior of the platform in addition to the construction  procedure to be used in future for mass production. <\/p>\n<p>The  technology will also demonstrate its capacity as a local content enabler,  largely due to the use of concrete as main construction material. The project  will spend 90% of its construction budget with the local supply chain (less  than 50 km away from the site).<\/p>\n<p>10\/28\/2020<\/p>\n<p><!-- Auto Generated --><\/p>\n<p>Here is the original post:<\/p>\n<p><a target=\"_blank\" rel=\"nofollow noopener noreferrer\" href=\"https:\/\/www.offshore-mag.com\/renewable-energy\/article\/14186333\/ferrovial-to-construct-demosath-floating-offshore-wind-platform\" title=\"Ferrovial to construct DemoSATH floating offshore wind platform - Offshore Oil and Gas Magazine\">Ferrovial to construct DemoSATH floating offshore wind platform - Offshore Oil and Gas Magazine<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p> (Courtesy Saitec Offshore Technologies) Offshore staff BILBAO, Spain Saitec Offshore Technologies and RWE Renewables have selected Ferrovial to manufacture and assemble the SATH floating platform in the DemoSATH project. The construction package is expected to last 14 months and covers site preparation, concrete precasting, procurement of steel bulkheads, and assembly of the floater along with management of the supply chain.  <a href=\"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/offshore\/ferrovial-to-construct-demosath-floating-offshore-wind-platform-offshore-oil-and-gas-magazine.php\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"limit_modified_date":"","last_modified_date":"","_lmt_disableupdate":"","_lmt_disable":"","footnotes":""},"categories":[431655],"tags":[],"class_list":["post-446977","post","type-post","status-publish","format-standard","hentry","category-offshore"],"modified_by":null,"_links":{"self":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/446977"}],"collection":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/comments?post=446977"}],"version-history":[{"count":0,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/446977\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/media?parent=446977"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/categories?post=446977"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/tags?post=446977"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}