{"id":445508,"date":"2020-10-08T02:04:48","date_gmt":"2020-10-08T06:04:48","guid":{"rendered":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/uncategorized\/living-quarters-pipe-racks-in-place-on-offshore-israel-fpso-offshore-oil-and-gas-magazine.php"},"modified":"2020-10-08T02:04:48","modified_gmt":"2020-10-08T06:04:48","slug":"living-quarters-pipe-racks-in-place-on-offshore-israel-fpso-offshore-oil-and-gas-magazine","status":"publish","type":"post","link":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/offshore\/living-quarters-pipe-racks-in-place-on-offshore-israel-fpso-offshore-oil-and-gas-magazine.php","title":{"rendered":"Living quarters, pipe racks in place on offshore Israel FPSO &#8211; Offshore Oil and Gas Magazine"},"content":{"rendered":"<p><p>Living quarter module installation.<\/p>\n<p>(Courtesy Energean)<\/p>\n<p>Offshore staff<\/p>\n<p>LONDON  Sembcorp Marines crane barge L-3601  has lifted the living quarter (LQ) module and eight pipe rack modules onto the FPSO  Energean Power hull at the  Admiralty Yard in Singapore.<\/p>\n<p>The FPSO will produce gas from the Karish  field in the Israeli sector of the Mediterranean Sea, operated by Energean.<\/p>\n<p>The LQ module  20 m (65.6 ft) long, 40 m (131 ft) wide, 26 m (85  ft) high and weighing 1,727 metric tons (1,904 tons)  has seven decks and will  accommodate 70 people during normal operations in single occupancy cabins.<\/p>\n<p>However, in periods of heavy maintenance, this could rise to 120 personnel  by increasing most cabins of the cabins to double occupancy.<\/p>\n<p>The pipe racks are designed to carry interface piping between the  various modules and hull systems and to provide space for cable trays  connecting the modules to the electrical house and instrument technical  room. <\/p>\n<p>Karish EPCIC contractor TechnipFMC has engaged Jumbos heavy  liftcrane vessel Fairplayer to lift and connect the  vessels 14 pre-laid and wet-stored mooring lines to the FPSO Energean Power, after it has sailed from  Singapore to Israel next summer.<\/p>\n<p>Energean is targeting first gas in the second half of 2021.<\/p>\n<p>10\/07\/2020<\/p>\n<p><!-- Auto Generated --><\/p>\n<p>Read this article:<\/p>\n<p><a target=\"_blank\" rel=\"nofollow noopener noreferrer\" href=\"https:\/\/www.offshore-mag.com\/rigs-vessels\/article\/14184841\/living-quarters-pipe-racks-in-place-on-offshore-israel-fpso\" title=\"Living quarters, pipe racks in place on offshore Israel FPSO - Offshore Oil and Gas Magazine\">Living quarters, pipe racks in place on offshore Israel FPSO - Offshore Oil and Gas Magazine<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p> Living quarter module installation. (Courtesy Energean) Offshore staff LONDON Sembcorp Marines crane barge L-3601 has lifted the living quarter (LQ) module and eight pipe rack modules onto the FPSO Energean Power hull at the Admiralty Yard in Singapore. The FPSO will produce gas from the Karish field in the Israeli sector of the Mediterranean Sea, operated by Energean.  <a href=\"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/offshore\/living-quarters-pipe-racks-in-place-on-offshore-israel-fpso-offshore-oil-and-gas-magazine.php\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"limit_modified_date":"","last_modified_date":"","_lmt_disableupdate":"","_lmt_disable":"","footnotes":""},"categories":[431655],"tags":[],"class_list":["post-445508","post","type-post","status-publish","format-standard","hentry","category-offshore"],"modified_by":null,"_links":{"self":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/445508"}],"collection":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/comments?post=445508"}],"version-history":[{"count":0,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/445508\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/media?parent=445508"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/categories?post=445508"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/tags?post=445508"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}