{"id":445497,"date":"2020-10-08T02:04:36","date_gmt":"2020-10-08T06:04:36","guid":{"rendered":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/uncategorized\/moray-east-offshore-construction-ramps-up-offshore-wind.php"},"modified":"2020-10-08T02:04:36","modified_gmt":"2020-10-08T06:04:36","slug":"moray-east-offshore-construction-ramps-up-offshore-wind","status":"publish","type":"post","link":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/offshore\/moray-east-offshore-construction-ramps-up-offshore-wind.php","title":{"rendered":"Moray East Offshore Construction Ramps Up &#8211; Offshore WIND"},"content":{"rendered":"<p><p>Cable laying vessel Living Stone has started the first inter-array cable installation campaign at the 950 MW Moray East wind farm offshore Scotland.<\/p>\n<p>The wind farm will feature 100 66 kV inter-array cables and two offshore substation interconnector cables supplied by JDR Cable System.<\/p>\n<p>The installation campaign will be carried out in three phases. The first campaign started on 29 September and will continue for eight weeks.<\/p>\n<p>Boskalis is in charge of supplying and installing the inter-array cables for the 100-turbine project.<\/p>\n<p>Export Cables<\/p>\n<p>Cable laying vessel NKT Victoria is expected to lay the wind farms three export cables by 3 October. Havila Phoenix is burying the cables.<\/p>\n<p>The first export cable made landfall at Inverboyndie in late August.<\/p>\n<p>Cable burial and trenching work is ongoing, with the trenching expected to continue until early November.<\/p>\n<p>This will be followed by a separate campaign to install remedial protection over the cables on any remaining unburied or unprotected sections.<\/p>\n<p>NKT is in charge of delivering and installing the wind farms export cables.<\/p>\n<p>Foundations<\/p>\n<p>As of 28 September, 35 out of the 100 turbine jacket foundations were installed at the site some 22 kilometres off the Aberdeenshire coast by Seajacks Scylla. <\/p>\n<p>The wind farms three Offshore Transformer Modules (OTMs) have been in place since mid-September.<\/p>\n<p>DEME isthe EPCI contractorfor the wind farms turbinefoundationsand three offshore substation foundations, as well as for the transport and installation of the OTMs. <\/p>\n<p>Moray Eastwill feature 100 MHI Vestas 9.5 MW wind turbines scheduled for full commissioning in 2022. <\/p>\n<p>Moray Offshore Windfarm East Ltd (MOWEL), the developer of the project, is a joint venture company owned by Diamond Green Limited (33.4%), Ocean Winds (56.6%) and CTG (10%). <\/p>\n<p><!-- Auto Generated --><\/p>\n<p>Link:<\/p>\n<p><a target=\"_blank\" rel=\"nofollow noopener noreferrer\" href=\"https:\/\/www.offshorewind.biz\/2020\/10\/02\/moray-east-offshore-construction-ramps-up\/\" title=\"Moray East Offshore Construction Ramps Up - Offshore WIND\">Moray East Offshore Construction Ramps Up - Offshore WIND<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p> Cable laying vessel Living Stone has started the first inter-array cable installation campaign at the 950 MW Moray East wind farm offshore Scotland.  <a href=\"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/offshore\/moray-east-offshore-construction-ramps-up-offshore-wind.php\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"limit_modified_date":"","last_modified_date":"","_lmt_disableupdate":"","_lmt_disable":"","footnotes":""},"categories":[431655],"tags":[],"class_list":["post-445497","post","type-post","status-publish","format-standard","hentry","category-offshore"],"modified_by":null,"_links":{"self":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/445497"}],"collection":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/comments?post=445497"}],"version-history":[{"count":0,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/445497\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/media?parent=445497"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/categories?post=445497"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/tags?post=445497"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}