{"id":440692,"date":"2020-08-12T06:58:19","date_gmt":"2020-08-12T10:58:19","guid":{"rendered":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/uncategorized\/construction-permit-sought-for-connecticut-offshore-wind-hub-offshore-wind-2.php"},"modified":"2020-08-12T06:58:19","modified_gmt":"2020-08-12T10:58:19","slug":"construction-permit-sought-for-connecticut-offshore-wind-hub-offshore-wind-2","status":"publish","type":"post","link":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/offshore\/construction-permit-sought-for-connecticut-offshore-wind-hub-offshore-wind-2.php","title":{"rendered":"Construction Permit Sought for Connecticut Offshore Wind Hub &#8211; Offshore WIND"},"content":{"rendered":"<p><p>The Connecticut Port Authority has applied for a permit from the U.S. Army Corps of Engineers for proposed work in the Thames River at State Pier, New London, Connecticut.<\/p>\n<p>The proposed project would serve as a long-term, regional offshore wind port facility while continuing to support other existing long-term breakbulk cargo operations.<\/p>\n<p>The proposed two-phase State Pier infrastructure improvement project includes demolition activities, fill between the two existing piers, onshore site work, and in-water activities in the Thames River. <\/p>\n<p>The U.S. Army Corps of Engineers is now soliciting comments from members of the public, federal, state, local agencies; Indian Tribes, and other interested parties to consider and evaluate the impacts of this proposed activity. Public comments should be forwarded no later than 3 September.<\/p>\n<p>The Connecticut Port Authority, Gateway Terminal, rsted, and Eversource reached a final agreement on the USD 157 million State Pier project in February.<\/p>\n<p>The first phase of construction to complete the facility infrastructure upgrades to meet the heavy-lift requirements of rsted and Eversources offshore wind projects is expected to begin in early 2021 and continue through August 2022. <\/p>\n<p>Following the completion of the infrastructure upgrade project, the rsted and Eversource joint venture company will enter into a ten-year lease agreement, which will allow it to use State Pier for wind turbine generator pre-assembly and staging to power their Revolution Wind, Sunrise Wind, and South Fork Wind projects with a combined capacity of more than 1.7 GW, including 304 MW coming to Connecticut through Revolution Wind. <\/p>\n<p>During periods where rsted and Eversource are not using State Pier, Gateway Terminal, the terminal operator, will market the facility to other customers to ensure maximum utilization of State Pier.<\/p>\n<p><!-- Auto Generated --><\/p>\n<p>Excerpt from: <\/p>\n<p><a target=\"_blank\" rel=\"nofollow noopener noreferrer\" href=\"https:\/\/www.offshorewind.biz\/2020\/08\/06\/construction-permit-sought-for-connecticut-offshore-wind-hub\/\" title=\"Construction Permit Sought for Connecticut Offshore Wind Hub - Offshore WIND\">Construction Permit Sought for Connecticut Offshore Wind Hub - Offshore WIND<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p> The Connecticut Port Authority has applied for a permit from the U.S. Army Corps of Engineers for proposed work in the Thames River at State Pier, New London, Connecticut.  <a href=\"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/offshore\/construction-permit-sought-for-connecticut-offshore-wind-hub-offshore-wind-2.php\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"limit_modified_date":"","last_modified_date":"","_lmt_disableupdate":"","_lmt_disable":"","footnotes":""},"categories":[431655],"tags":[],"class_list":["post-440692","post","type-post","status-publish","format-standard","hentry","category-offshore"],"modified_by":null,"_links":{"self":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/440692"}],"collection":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/comments?post=440692"}],"version-history":[{"count":0,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/440692\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/media?parent=440692"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/categories?post=440692"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/tags?post=440692"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}