{"id":429623,"date":"2020-08-07T20:00:56","date_gmt":"2020-08-08T00:00:56","guid":{"rendered":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/uncategorized\/verdant-power-progressing-tidal-energy-project-in-new-york-offshore-oil-and-gas-magazine.php"},"modified":"2020-08-07T20:00:56","modified_gmt":"2020-08-08T00:00:56","slug":"verdant-power-progressing-tidal-energy-project-in-new-york-offshore-oil-and-gas-magazine","status":"publish","type":"post","link":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/offshore\/verdant-power-progressing-tidal-energy-project-in-new-york-offshore-oil-and-gas-magazine.php","title":{"rendered":"Verdant Power progressing tidal energy project in New York &#8211; Offshore Oil and Gas Magazine"},"content":{"rendered":"<p><p>Tidal energy turbines are integrated with the TriFrame in preparation for a fall deployment in the East River.<\/p>\n<p>(Courtesy Verdant Power)<\/p>\n<p>Offshore staff<\/p>\n<p>NEW YORK CITY  Verdant Power has taken  additional steps toward the installation of three, fifth-generation tidal  power turbines on the companys TriFrame mount at its Roosevelt Island Tidal  Energy (RITE) Project site in the East River in New York City. <\/p>\n<p>The turbines  were transported from the companys New Jersey marine engineering support  services facility to a marine vessel installation services area. They have been  integrated onto a TriFrame mount in preparation for on-water delivery and  deployment at the RITE Project site.<\/p>\n<p>In addition,  the RITE Project Control Room on Roosevelt Island is being readied for the  turbine system installation, which is planned for autumn 2020. <\/p>\n<p>The company plans  to install three of its fifth generation Free Flow Systems or kinetic  hydropower system (KHPS) turbines on a single TriFrame mount in the East River.  This will be the pre-commercial phase of the companys RITE Project to design  its KHPS tidal turbine, optimize the economics of installation and maintenance  of arrays, and prove performance. <\/p>\n<p>This is  the final pre-commercialization phase in a process that has seen 23 government  agencies approve work on the RITE Project, said Verdant Power CEO John T.  Banigan. We are proud to have been the first licensed tidal power project in  the US.<\/p>\n<p>Our focus  is on maximizing system power performance, increasing availability and  reliability, and reducing project capex and operating costs, added Banigan.  The RITE Project not only will demonstrate clean power from the tidal  currents, but also will demonstrate tidal power as a viable energy resource  advancing our industry in the US and globally. <\/p>\n<p>The RITE  Project site will generate electricity under a hydrokinetic pilot project  license issued by the Federal Energy Regulatory Commission.<\/p>\n<p>The project has been supported by the New York  State Energy Research and Development Authority and the US Department of  Energy, in addition to New York-based private equity capital support.<\/p>\n<p>08\/07\/2020<\/p>\n<p><!-- Auto Generated --><\/p>\n<p>Go here to read the rest: <\/p>\n<p><a target=\"_blank\" rel=\"nofollow noopener noreferrer\" href=\"https:\/\/www.offshore-mag.com\/renewable-energy\/article\/14181283\/verdant-power-progressing-tidal-energy-project-in-new-york\" title=\"Verdant Power progressing tidal energy project in New York - Offshore Oil and Gas Magazine\">Verdant Power progressing tidal energy project in New York - Offshore Oil and Gas Magazine<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p> Tidal energy turbines are integrated with the TriFrame in preparation for a fall deployment in the East River. (Courtesy Verdant Power) Offshore staff NEW YORK CITY Verdant Power has taken additional steps toward the installation of three, fifth-generation tidal power turbines on the companys TriFrame mount at its Roosevelt Island Tidal Energy (RITE) Project site in the East River in New York City <a href=\"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/offshore\/verdant-power-progressing-tidal-energy-project-in-new-york-offshore-oil-and-gas-magazine.php\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"limit_modified_date":"","last_modified_date":"","_lmt_disableupdate":"","_lmt_disable":"","footnotes":""},"categories":[431655],"tags":[],"class_list":["post-429623","post","type-post","status-publish","format-standard","hentry","category-offshore"],"modified_by":null,"_links":{"self":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/429623"}],"collection":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/comments?post=429623"}],"version-history":[{"count":0,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/429623\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/media?parent=429623"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/categories?post=429623"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/tags?post=429623"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}