{"id":417039,"date":"2020-07-31T09:05:21","date_gmt":"2020-07-31T13:05:21","guid":{"rendered":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/uncategorized\/blue-offshore-transports-hollandse-kust-zuid-offshore-the-netherlands-wind-farm-cables-offshore-oil-and-gas-magazine.php"},"modified":"2020-07-31T09:05:21","modified_gmt":"2020-07-31T13:05:21","slug":"blue-offshore-transports-hollandse-kust-zuid-offshore-the-netherlands-wind-farm-cables-offshore-oil-and-gas-magazine","status":"publish","type":"post","link":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/offshore\/blue-offshore-transports-hollandse-kust-zuid-offshore-the-netherlands-wind-farm-cables-offshore-oil-and-gas-magazine.php","title":{"rendered":"Blue Offshore transports Hollandse Kust (zuid) offshore the Netherlands wind farm cables &#8211; Offshore Oil and Gas Magazine"},"content":{"rendered":"<p><p>The barge CC Atlantique with 2 x 4,000 metric ton cable moored in Rotterdam.<\/p>\n<p>(Courtesy Blue Offshore)<\/p>\n<p>Offshore staff<\/p>\n<p>THE HAGUE, the Netherlands  Van Oord  has contracted Blue Offshore to supply a full cable transport spread for both  the Hollandse  Kust (zuid) Alpha and Beta campaigns.<\/p>\n<p>On Sunday July  19, the tug Kamarina and barge CC Atlantique carrying more than 8,000 metric  tons of high voltage cable arrived in Rotterdam, the Netherlands. The cables  will form the connection of TenneTs Hollandse Kust (zuid) Alpha platform to  the onshore grid. <\/p>\n<p>For this  transport Blue Offshore mobilized what is said to be the worlds first  certified double basket carrousel barge, with each carrousel carrying about  4,000 metric tons of cable. The transport took place from Hellenic Cables in  Greece to the port of Rotterdam. <\/p>\n<p>Van Oord  charted the 122-m (400-ft) long CC  Atlantique. Besides two large carousels and the dedicated control systems, Blue  Offshore provided all deck engineering, technical crew and complete mobilization  service. <\/p>\n<p>The cables  will soon be loaded onto Van Oords cable lay vessel Nexus for installation offshore in the Dutch North Sea. A spare  cable will be delivered to TenneT in Eemshaven.<\/p>\n<p>The  Hollandse Kust (zuid) Alpha grid connection is expected to be ready in 2021.  Beta is scheduled for completion in 2022. The HKZ wind parks will  supply 1,500 MW of renewable energy, sufficient to power 3 million households. <\/p>\n<p>07\/28\/2020<\/p>\n<p><!-- Auto Generated --><\/p>\n<p>See original here: <\/p>\n<p><a target=\"_blank\" rel=\"nofollow noopener noreferrer\" href=\"https:\/\/www.offshore-mag.com\/renewable-energy\/article\/14180519\/blue-offshore-transports-hollandse-kust-zuid-offshore-the-netherlands-wind-farm-cables\" title=\"Blue Offshore transports Hollandse Kust (zuid) offshore the Netherlands wind farm cables - Offshore Oil and Gas Magazine\">Blue Offshore transports Hollandse Kust (zuid) offshore the Netherlands wind farm cables - Offshore Oil and Gas Magazine<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p> The barge CC Atlantique with 2 x 4,000 metric ton cable moored in Rotterdam. (Courtesy Blue Offshore) Offshore staff THE HAGUE, the Netherlands Van Oord has contracted Blue Offshore to supply a full cable transport spread for both the Hollandse Kust (zuid) Alpha and Beta campaigns. On Sunday July 19, the tug Kamarina and barge CC Atlantique carrying more than 8,000 metric tons of high voltage cable arrived in Rotterdam, the Netherlands.  <a href=\"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/offshore\/blue-offshore-transports-hollandse-kust-zuid-offshore-the-netherlands-wind-farm-cables-offshore-oil-and-gas-magazine.php\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"limit_modified_date":"","last_modified_date":"","_lmt_disableupdate":"","_lmt_disable":"","footnotes":""},"categories":[431655],"tags":[],"class_list":["post-417039","post","type-post","status-publish","format-standard","hentry","category-offshore"],"modified_by":null,"_links":{"self":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/417039"}],"collection":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/comments?post=417039"}],"version-history":[{"count":0,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/417039\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/media?parent=417039"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/categories?post=417039"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/tags?post=417039"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}