{"id":410400,"date":"2020-07-29T15:07:40","date_gmt":"2020-07-29T19:07:40","guid":{"rendered":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/uncategorized\/export-cable-laying-soon-to-begin-at-moray-east-offshore-wind-project-offshore-wind-3.php"},"modified":"2020-07-29T15:07:40","modified_gmt":"2020-07-29T19:07:40","slug":"export-cable-laying-soon-to-begin-at-moray-east-offshore-wind-project-offshore-wind-3","status":"publish","type":"post","link":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/offshore\/export-cable-laying-soon-to-begin-at-moray-east-offshore-wind-project-offshore-wind-3.php","title":{"rendered":"Export Cable Laying Soon to Begin at Moray East Offshore Wind Project &#8211; Offshore WIND"},"content":{"rendered":"<p><p>The boulder picking operations have begun at the export cable route of the Moray East offshore wind project in Scotland.<\/p>\n<p>The boulder picking work started on 24 July using Olympic Triton, while the export cable laying and trenching operations are set to begin circa 28 July.<\/p>\n<p>NKT Victoria will be laying the three export cables between the project site and the cable landfall, via three separate drilled HDD ducts near Boyndie Bay.<\/p>\n<p>The vessel Havila Phoenix will undertake operations to bury these subsea power cables. Cable laying is expected to be completed by approximately 3 October.<\/p>\n<p>According to the projects weekly notice of operations, ten jacket foundations have so far been installed at the site some 22km off the Aberdeenshire coast. <\/p>\n<p>The 950 MW Moray Eastwill consist of 100 MHI Vestas 9.5 MW turbines and three offshore substation platforms expected to be operational by 2022. <\/p>\n<p><!-- Auto Generated --><\/p>\n<p>Read the original: <\/p>\n<p><a target=\"_blank\" rel=\"nofollow noopener noreferrer\" href=\"https:\/\/www.offshorewind.biz\/2020\/07\/28\/export-cable-laying-soon-to-begin-at-moray-east-offshore-wind-project\/\" title=\"Export Cable Laying Soon to Begin at Moray East Offshore Wind Project - Offshore WIND\">Export Cable Laying Soon to Begin at Moray East Offshore Wind Project - Offshore WIND<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p> The boulder picking operations have begun at the export cable route of the Moray East offshore wind project in Scotland.  <a href=\"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/offshore\/export-cable-laying-soon-to-begin-at-moray-east-offshore-wind-project-offshore-wind-3.php\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"limit_modified_date":"","last_modified_date":"","_lmt_disableupdate":"","_lmt_disable":"","footnotes":""},"categories":[431655],"tags":[],"class_list":["post-410400","post","type-post","status-publish","format-standard","hentry","category-offshore"],"modified_by":null,"_links":{"self":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/410400"}],"collection":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/comments?post=410400"}],"version-history":[{"count":0,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/410400\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/media?parent=410400"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/categories?post=410400"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/tags?post=410400"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}