{"id":381081,"date":"2020-07-14T22:50:04","date_gmt":"2020-07-15T02:50:04","guid":{"rendered":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/uncategorized\/first-taiwan-built-offshore-installation-vessel-to-marinelink.php"},"modified":"2020-07-14T22:50:04","modified_gmt":"2020-07-15T02:50:04","slug":"first-taiwan-built-offshore-installation-vessel-to-marinelink","status":"publish","type":"post","link":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/offshore\/first-taiwan-built-offshore-installation-vessel-to-marinelink.php","title":{"rendered":"First Taiwan-Built Offshore Installation Vessel To &#8211; MarineLink"},"content":{"rendered":"<p><p>Finland-based marine engine and technology provider Wrtsil has been tasked to equip the first Taiwan-built offshore wind installation vessel - the Green Jade - with \"a broad scope\" of its solutions.<\/p>\n<p>The 216 meters long vessel will be built at the CSBC shipyard in Taiwan for the joint-venture company CDWE owned by CSBC and Belgium-based DEME Group. <\/p>\n<p>The vessel is expected to play a major role in developing the offshore wind farm business in both new and established markets, including Taiwan.<\/p>\n<p>Under the order, Wrtsil will deliver four Wrtsil 46DF and two Wrtsil 20DF dual-fuel engines, as well as Transverse and Steerable Thrusters, DP-3 solution, a Navigation system, and selective catalytic reduction (SCR) systems for emissions abatement. The company will also provide site supervision services.<\/p>\n<p>The Wrtsil equipment is scheduled to be delivered during 2021 and the ship is expected to begin operations in the Taiwan Strait in 2023.<\/p>\n<p>The Green Jade, with its 4,000-tonne crane capacity and DP3 capability, will serve the offshore wind market, and according to CDWE , will be able to transport a multitude of heaviest monopiles, jackets, wind turbine components and structures in a single shipment.<\/p>\n<p><!-- Auto Generated --><\/p>\n<p>Go here to see the original: <\/p>\n<p><a target=\"_blank\" rel=\"nofollow noopener noreferrer\" href=\"https:\/\/www.marinelink.com\/news\/first-taiwanbuilt-offshore-installation-480150\" title=\"First Taiwan-Built Offshore Installation Vessel To - MarineLink\">First Taiwan-Built Offshore Installation Vessel To - MarineLink<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p> Finland-based marine engine and technology provider Wrtsil has been tasked to equip the first Taiwan-built offshore wind installation vessel - the Green Jade - with \"a broad scope\" of its solutions. The 216 meters long vessel will be built at the CSBC shipyard in Taiwan for the joint-venture company CDWE owned by CSBC and Belgium-based DEME Group <a href=\"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/offshore\/first-taiwan-built-offshore-installation-vessel-to-marinelink.php\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"limit_modified_date":"","last_modified_date":"","_lmt_disableupdate":"","_lmt_disable":"","footnotes":""},"categories":[431655],"tags":[],"class_list":["post-381081","post","type-post","status-publish","format-standard","hentry","category-offshore"],"modified_by":null,"_links":{"self":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/381081"}],"collection":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/comments?post=381081"}],"version-history":[{"count":0,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/381081\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/media?parent=381081"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/categories?post=381081"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/tags?post=381081"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}