{"id":336756,"date":"2020-01-05T12:52:25","date_gmt":"2020-01-05T17:52:25","guid":{"rendered":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/uncategorized\/worlds-largest-offshore-wind-farm-to-pay-millions-after-massive-blackout-recharge-2.php"},"modified":"2020-01-05T12:52:25","modified_gmt":"2020-01-05T17:52:25","slug":"worlds-largest-offshore-wind-farm-to-pay-millions-after-massive-blackout-recharge-2","status":"publish","type":"post","link":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/offshore\/worlds-largest-offshore-wind-farm-to-pay-millions-after-massive-blackout-recharge-2.php","title":{"rendered":"World&#8217;s largest offshore wind farm to pay millions after massive blackout &#8211; Recharge"},"content":{"rendered":"<p><p>The worlds largest operating offshore wind farm  the Orsted-run Hornsea 1  will pay 4.5m ($5.9m) over its part in a massive blackout that left more than a million people without power last summer.<\/p>\n<p>The 1.2GW Hornsea 1 off eastern England will pay out after dropping off the network as part of a wider sequence of failures that hit the UK system in August.<\/p>\n<p>Along with a simultaneous disconnection by a gas-fired plant  whose operator RWE will pay the same sum  the event, triggered by a lightning strike on a transmission line, caused chaos to transport and other critical infrastructure.<\/p>\n<p>UK energy regulator Ofgem, which launched a probe into the blackout, said: Consumers and businesses rely on generators and network companies to provide a secure and stable power supply. August 9 showed how much disruption and distress is caused to consumers across the UK when this does not happen.<\/p>\n<p>That is why it is right that companies that were unable to keep generating have paid into our consumer redress fund.<\/p>\n<p>The Danish offshore wind giant said in a statement sent to Recharge: Together with every organisation involved with the UK electricity system, we work hard to provide a reliable, resilient service and take any interruption very seriously. The power outage on August 9 was caused by an extremely rare sequence of events, involving a number of parties, and the issue we experienced at Hornsea 1 was quickly resolved.<\/p>\n<p>However, in recognition of our role in the outage, we have offered to make a voluntary contribution to Ofgems redress fund. We have co-operated with Ofgem throughout their investigations and conducted a thorough internal review of the events in order to prevent a situation like this from happening again. <\/p>\n<p>We will continue to work hard to bring clean, carbon free electricity to millions of homes across the UK.<\/p>\n<p>Hornsea 1 was at the time of the blackout still under construction and only partly exporting power from its 7MW Siemens Gamesa turbines, the last of which was installed in October.<\/p>\n<p><!-- Auto Generated --><\/p>\n<p>The rest is here: <\/p>\n<p><a target=\"_blank\" rel=\"nofollow noopener noreferrer\" href=\"https:\/\/www.rechargenews.com\/wind\/worlds-largest-offshore-wind-farm-to-pay-millions-after-massive-blackout\/2-1-731635\" title=\"World's largest offshore wind farm to pay millions after massive blackout - Recharge\">World's largest offshore wind farm to pay millions after massive blackout - Recharge<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p> The worlds largest operating offshore wind farm the Orsted-run Hornsea 1 will pay 4.5m ($5.9m) over its part in a massive blackout that left more than a million people without power last summer.  <a href=\"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/offshore\/worlds-largest-offshore-wind-farm-to-pay-millions-after-massive-blackout-recharge-2.php\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"limit_modified_date":"","last_modified_date":"","_lmt_disableupdate":"","_lmt_disable":"","footnotes":""},"categories":[431655],"tags":[],"class_list":["post-336756","post","type-post","status-publish","format-standard","hentry","category-offshore"],"modified_by":null,"_links":{"self":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/336756"}],"collection":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/comments?post=336756"}],"version-history":[{"count":0,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/336756\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/media?parent=336756"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/categories?post=336756"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/tags?post=336756"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}