{"id":303785,"date":"2018-11-27T23:45:03","date_gmt":"2018-11-28T04:45:03","guid":{"rendered":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/uncategorized\/worlds-largest-offshore-wind-turbine-haliade-x-ge.php"},"modified":"2018-11-27T23:45:03","modified_gmt":"2018-11-28T04:45:03","slug":"worlds-largest-offshore-wind-turbine-haliade-x-ge","status":"publish","type":"post","link":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/offshore\/worlds-largest-offshore-wind-turbine-haliade-x-ge.php","title":{"rendered":"Worlds Largest Offshore Wind Turbine | Haliade-X | GE &#8230;"},"content":{"rendered":"<p><p>Investing in the future        <\/p>\n<p>The offshore wind market is booming and is expected to grow significantly over the next two decades; from todays 14 GW install capacity to 100 GW+ by 2030. Recognizing this need, GE is leading the field of offshore wind turbine manufacturers by investing $400 millionover the next three to five years in development and deployment of the Haliade-X.<\/p>\n<p>This investment will take place over the next two to five years and includes a $57 (46) million investments in Saint-Nazaire to adapt the site for Haliade-X nacelle assembly. Saint Nazaires know-how will play a crucial and leading role in the development of this innovative project, with offshore wind turbine construction at higher capacities. An additional $93 (75) million in Cherbourg for tooling, blade molds, assembly line and blade development. This project will create 550 direct jobs in Cherbourg over the course of the next 3 years (around 100 in 2018).\"><\/p>\n<p>For more information on the Haliade-X 12 MWoffshore wind turbine as well as advancements in Haliade-Xoffshore wind turbine platform, installation and design, contact GE today.<\/p>\n<p>*Capacity factor compares how much energy was generated against the maximum that could have been produced at continuous full power operation during a specific period of time.<\/p>\n<p>**Balance of Plant (BOP) is the costs attributed to one unit over its lifetime  O&M, operating expenses.<\/p>\n<p><!-- Auto Generated --><\/p>\n<p>Go here to see the original:<\/p>\n<p><a target=\"_blank\" rel=\"nofollow\" href=\"https:\/\/www.ge.com\/renewableenergy\/wind-energy\/turbines\/haliade-x-offshore-turbine\" title=\"Worlds Largest Offshore Wind Turbine | Haliade-X | GE ...\">Worlds Largest Offshore Wind Turbine | Haliade-X | GE ...<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p> Investing in the future The offshore wind market is booming and is expected to grow significantly over the next two decades; from todays 14 GW install capacity to 100 GW+ by 2030. Recognizing this need, GE is leading the field of offshore wind turbine manufacturers by investing $400 millionover the next three to five years in development and deployment of the Haliade-X.  <a href=\"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/offshore\/worlds-largest-offshore-wind-turbine-haliade-x-ge.php\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"limit_modified_date":"","last_modified_date":"","_lmt_disableupdate":"","_lmt_disable":"","footnotes":""},"categories":[431655],"tags":[],"class_list":["post-303785","post","type-post","status-publish","format-standard","hentry","category-offshore"],"modified_by":null,"_links":{"self":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/303785"}],"collection":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/comments?post=303785"}],"version-history":[{"count":0,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/303785\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/media?parent=303785"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/categories?post=303785"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/tags?post=303785"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}