{"id":28542,"date":"2010-08-18T08:11:27","date_gmt":"2010-08-18T08:11:27","guid":{"rendered":"http:\/\/euvolution.com\/futurist-transhuman-news-blog\/loop-a-ammonia-pump-replaced-on-iss-in-third-eva\/"},"modified":"2010-08-18T08:11:27","modified_gmt":"2010-08-18T08:11:27","slug":"loop-a-ammonia-pump-replaced-on-iss-in-third-eva","status":"publish","type":"post","link":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/nasa\/loop-a-ammonia-pump-replaced-on-iss-in-third-eva.php","title":{"rendered":"Loop A Ammonia Pump Replaced on ISS In Third EVA"},"content":{"rendered":"<p><img decoding=\"async\" src=\"http:\/\/euvolution.com\/futurist-transhuman-news-blog\/wp-content\/plugins\/wp-o-matic\/cache\/6bd38_iss.98.jpg\" alt=\"\" border=\"0\" align=\"right\" style=\"padding-left:10px; padding-right: 10px;\"><a href=\"http:\/\/www.spaceref.com\/news\/viewsr.html?pid=34726\">NASA ISS On-Orbit Status 16 August 2010<\/a><\/p><p><i>\"Stage EVA-17 by FE-4 Doug Wheelock &amp; FE-2 Tracy Caldwell-Dyson was completed successfully in 7hr 20min, fully accomplishing its objective of installing the spare ETCS (External Thermal Control System) Loop A PM (Pump Module) plus additional tasks. The PM has been checked out and is functioning nominally. Loop A will be fully in service later this week. This was the third contingency spacewalk to replace the Loop A ammonia pump.\"<\/i><\/p><p>    <img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/euvolution.com\/futurist-transhuman-news-blog\/wp-content\/plugins\/wp-o-matic\/cache\/6bd38_ooJhmBgttWM\" height=\"1\" width=\"1\" style=\"padding-left:10px; padding-right: 10px;\"><\/p>","protected":false},"excerpt":{"rendered":"<p>NASA ISS On-Orbit Status 16 August 2010\"Stage EVA-17 by FE-4 Doug Wheelock &amp; FE-2 Tracy Caldwell-Dyson was completed successfully in 7hr 20min, fully accomplishing its objective of installing the spare ETCS (External Thermal Control System) Loop A PM (Pump Module) &hellip; <a href=\"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/nasa\/loop-a-ammonia-pump-replaced-on-iss-in-third-eva.php\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"limit_modified_date":"","last_modified_date":"","_lmt_disableupdate":"","_lmt_disable":"","footnotes":""},"categories":[20],"tags":[],"class_list":["post-28542","post","type-post","status-publish","format-standard","hentry","category-nasa"],"modified_by":null,"_links":{"self":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/28542"}],"collection":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/comments?post=28542"}],"version-history":[{"count":0,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/28542\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/media?parent=28542"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/categories?post=28542"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/tags?post=28542"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}