{"id":238332,"date":"2017-08-25T00:47:41","date_gmt":"2017-08-25T04:47:41","guid":{"rendered":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/uncategorized\/leeds-research-centre-set-for-green-light-insider-media.php"},"modified":"2017-08-25T00:47:41","modified_gmt":"2017-08-25T04:47:41","slug":"leeds-research-centre-set-for-green-light-insider-media","status":"publish","type":"post","link":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/nano-engineering\/leeds-research-centre-set-for-green-light-insider-media.php","title":{"rendered":"Leeds research centre set for green light &#8211; Insider Media"},"content":{"rendered":"<p><p>Images courtesy of  ADP Manchester   <\/p>\n<p>    Plans for a world class research and development centre close    to the Parkinson Building in the centre of Leeds look set to be    approved.  <\/p>\n<p>    The University of Leeds submitted plans for its Integrated    Campus for Engineering and Physical Sciences (ICEPS) in June    2017 and the designs will go before Leeds City Council's city    plans panel on 31 August.  <\/p>\n<p>    The planning report concluded that the panel should defer and    delegate the decision to the chief planning officer for    approval.  <\/p>\n<p>    It said: \"It is considered that the public benefits of the    development, in enabling the university to deliver a step    change in achieving the Universitys ambitions of world-class    research and student education, outweigh the minor harm to the    heritage significance of the building and its surroundings    whilst alternative forms of development would be more harmful.\"  <\/p>\n<p>    ICEPS would be a multi-disciplinary teaching facility with    resources for research and student education in the engineering    and physical sciences disciplines.  <\/p>\n<p>    The new building would encompass new lab spaces specifically    for the high specification equipment required to undertake    modern research and enable growth in these areas.  <\/p>\n<p>    It would consist of a new six-storey (plus a basement) building    and the refurbishment of and new roof to the grade II-listed    Old Mining Building. The facility would contain the highly    technical laboratory, postgraduate research spaces,    undergraduate teaching and academic offices.  <\/p>\n<p>    The design and access statement said: \"The Integrated Campus    for Engineering and Physical Sciences is a unique and exciting    opportunity at the University of Leeds.  <\/p>\n<p>    \"The project will deliver state of the art and exemplary    facilities capable of supporting the longterm development of    physical, bio-nano, computing and engineering sciences through    enhanced educational and research facilities.  <\/p>\n<p>    \"This will enable a step change in achieving the universitys    ambitions of world-class research and student education through    the delivery of a flagship development.\"  <\/p>\n<p><!-- Auto Generated --><\/p>\n<p>More: <\/p>\n<p><a target=\"_blank\" href=\"https:\/\/www.insidermedia.com\/insider\/yorkshire\/leeds-research-centre-set-for-approval\" title=\"Leeds research centre set for green light - Insider Media\">Leeds research centre set for green light - Insider Media<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p> Images courtesy of ADP Manchester Plans for a world class research and development centre close to the Parkinson Building in the centre of Leeds look set to be approved. The University of Leeds submitted plans for its Integrated Campus for Engineering and Physical Sciences (ICEPS) in June 2017 and the designs will go before Leeds City Council's city plans panel on 31 August.  <a href=\"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/nano-engineering\/leeds-research-centre-set-for-green-light-insider-media.php\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"limit_modified_date":"","last_modified_date":"","_lmt_disableupdate":"","_lmt_disable":"","footnotes":""},"categories":[8],"tags":[],"class_list":["post-238332","post","type-post","status-publish","format-standard","hentry","category-nano-engineering"],"modified_by":null,"_links":{"self":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/238332"}],"collection":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/comments?post=238332"}],"version-history":[{"count":0,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/238332\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/media?parent=238332"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/categories?post=238332"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/tags?post=238332"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}