{"id":234319,"date":"2017-08-12T20:23:46","date_gmt":"2017-08-13T00:23:46","guid":{"rendered":"http:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/uncategorized\/progress-continues-on-lakeland-elementary-school-project-west-central-tribune.php"},"modified":"2017-08-12T20:23:46","modified_gmt":"2017-08-13T00:23:46","slug":"progress-continues-on-lakeland-elementary-school-project-west-central-tribune","status":"publish","type":"post","link":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/progress\/progress-continues-on-lakeland-elementary-school-project-west-central-tribune.php","title":{"rendered":"Progress continues on Lakeland Elementary School project &#8211; West Central Tribune"},"content":{"rendered":"<p><p>    From a distance, large gaps in the exterior might make people    question the progress, but the interior's a busy place. Crews    are working their way through classrooms finishing and painting    walls and mounting white boards.  <\/p>\n<p>    On a tour of the new PK-5 school this week, senior project    manager Stephen Plantenberg explained the timeline for the    school, which is scheduled to open in January. Lakeland is in    southeastern Willmar along Lakeland Drive, east of the    Kandiyohi County YMCA.  <\/p>\n<p>    Superintendent Jeff Holm and School Board member Justin Bos    joined the tour. Plantenberg works for RA Morton Construction    Managers of St. Cloud, hired by the school district to oversee    the largest of the referendum projects.  <\/p>\n<p>    The building was to have opened this month, but bad weather and    other issues caused delays. It's now scheduled to open in    January. \"I don't see any reason why that won't happen,\"    Plantenberg said.  <\/p>\n<p>    The school is the largest part of a $52.35 million building    program approved by voters in a 2015 bond referendum. Bids on    Lakeland construction so far have totaled about $20 million,    and it is within budget. The budget includes building furniture    and equipment for two playgrounds.  <\/p>\n<p>    Plantenberg said casework and terrazzo flooring will arrive    soon, and contractors plan to have major construction finished    by Oct. 15. Final finishing, cleaning and mechanical system    testing will take place after that. Some time-consuming    projects, like the curing of the wooden gym floor, could take a    bit longer.  <\/p>\n<p>    Plantenberg led the tour through the education wing, where each    grade will have a pod of classrooms surrounding a commons area    for group activities. Crews are working their way through the    rooms, finishing and painting walls and installing rest room    tiles.  <\/p>\n<p>    \"It definitely feels good to see the progress,\" Holm said.    \"It's easier to visualize the final product.\"  <\/p>\n<p>    Bos said he thinks most people are excited to see the school    open, \"just like we are.\" Residents are excited to have a    school opening again in that part of town.  <\/p>\n<p>    The building will be built to last. For example, \"all the    piping is soldered, not crimped,\" something that takes more    time but should last longer, Plantenberg said.  <\/p>\n<p>    Workers poured the last of the concrete for the floor in the    school's commons\/cafeteria area this week. In the gym, workers    were on scissor lifts, installing duct work in the ceiling.  <\/p>\n<p>    Throughout the building, ceilings are open, revealing what    appears to be miles of pipes and wiring.  <\/p>\n<p>    Installation of kitchen equipment hasn't started, but the    plumbing and wiring is ready for it.  <\/p>\n<p>    Outside the construction zone, grasses and weeds nearly waist    high cover the school site.  <\/p>\n<p>    Plantenberg said landscaping and playground preparation is    scheduled for fall. The entire site will be fenced, too.  <\/p>\n<p>    The fence will keep children away from a drainage ditch at the    eastern boundary of the school site. \"That ditch rarely has    water in it, but it is quite steep,\" Holm said, and fencing    will keep adventurous students in sight.  <\/p>\n<p>    Plantenberg said many local contractors have worked on the    building, and he's been pleased with their dedication to the    project and the quality of their work.  <\/p>\n<p><!-- Auto Generated --><\/p>\n<p>Read more from the original source:<\/p>\n<p><a target=\"_blank\" rel=\"nofollow\" href=\"http:\/\/www.wctrib.com\/news\/local\/4311502-progress-continues-lakeland-elementary-school-project\" title=\"Progress continues on Lakeland Elementary School project - West Central Tribune\">Progress continues on Lakeland Elementary School project - West Central Tribune<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p> From a distance, large gaps in the exterior might make people question the progress, but the interior's a busy place. Crews are working their way through classrooms finishing and painting walls and mounting white boards <a href=\"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/progress\/progress-continues-on-lakeland-elementary-school-project-west-central-tribune.php\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"limit_modified_date":"","last_modified_date":"","_lmt_disableupdate":"","_lmt_disable":"","footnotes":""},"categories":[431575],"tags":[],"class_list":["post-234319","post","type-post","status-publish","format-standard","hentry","category-progress"],"modified_by":null,"_links":{"self":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/234319"}],"collection":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/comments?post=234319"}],"version-history":[{"count":0,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/234319\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/media?parent=234319"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/categories?post=234319"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/tags?post=234319"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}