{"id":232897,"date":"2017-08-06T09:11:16","date_gmt":"2017-08-06T13:11:16","guid":{"rendered":"http:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/uncategorized\/big-progress-for-new-sewage-pipe-project-in-heartland-america-park-ketv-omaha.php"},"modified":"2017-08-06T09:11:16","modified_gmt":"2017-08-06T13:11:16","slug":"big-progress-for-new-sewage-pipe-project-in-heartland-america-park-ketv-omaha","status":"publish","type":"post","link":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/progress\/big-progress-for-new-sewage-pipe-project-in-heartland-america-park-ketv-omaha.php","title":{"rendered":"Big progress for new sewage pipe project in Heartland America Park &#8211; KETV Omaha"},"content":{"rendered":"<p><p>OMAHA, Neb.   <\/p>\n<p>    A big breakthrough for Omaha's sewer separation project took    place Saturday when a giant tunnel-boring machine drilled    through a shaft in Heartland America Park. This moves one of    the city's newest sewer mains forward, after some major    setbacks and big costs.  <\/p>\n<p>    \"It's a big relief seeing this tunnel machine show up today,\"    said Scott Aurit, the project delivery team lead for the Clean    Solutions for Omaha program.  <\/p>\n<p>    The tunnel 80 feet under Heartland America Park is just a small    piece of the massive CSO project, which is aimed at reducing    waste from flowing into the Missouri River.  <\/p>\n<p>    In December 2015, construction workers began digging the    3,500-foot tunnel, starting near Sixth and Leavenworth and    working toward the northeast corner of Heartland America Park.  <\/p>\n<p>    Work came to a halt in May 2016 when the tunnel-boring machine    got stuck underground.  <\/p>\n<p>    \"Our machine that was designed to go through rock was unable to    continue tunneling because we started encountering boulders and    also ground water conditions,\" Aurit said.  <\/p>\n<p>    The hiccup cost the city an additional $2.5 million, bringing    the portion of the CSO project to more than $30 million and    pushing the completion date back by a year.  <\/p>\n<p>    \"The contractors have done a really good job working diligently    and we've been maintaining the schedule to complete this by the    end of the year,\" Aurit said.  <\/p>\n<p>    Workers built a new shaft to reach the trapped drill and    brought in a bigger and better tunnel-boring machine. They    started working from the opposite direction, and Saturday    nearly finished drilling the 900 feet of the tunnel that the    old machine couldn't.  <\/p>\n<p>    With the new machine reaching the shaft, the current phase of    the project is almost complete. Next, workers will install    another pipe, test it and hope to start operation by October or    November.  <\/p>\n<p>    \"Replacing our aging and our old infrastructure as well as    maximizing,\" Aurit said. \"We want to try and get as much flow    to the Missouri River treatment plant for treatment.\"  <\/p>\n<p>    While the new machine reached the shaft Saturday, it still has    a little ways to go. It only moves about five feet every hour.  <\/p>\n<p>    Workers will also remove the machine that's stuck sometime next    week.  <\/p>\n<p>    The total cost of the CSO project is $2.2 billion.  <\/p>\n<p><!-- Auto Generated --><\/p>\n<p>Go here to see the original: <\/p>\n<p><a target=\"_blank\" rel=\"nofollow\" href=\"http:\/\/www.ketv.com\/article\/big-progress-for-new-sewage-pipe-project-in-heartland-america-park\/11642773\" title=\"Big progress for new sewage pipe project in Heartland America Park - KETV Omaha\">Big progress for new sewage pipe project in Heartland America Park - KETV Omaha<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p> OMAHA, Neb. A big breakthrough for Omaha's sewer separation project took place Saturday when a giant tunnel-boring machine drilled through a shaft in Heartland America Park. This moves one of the city's newest sewer mains forward, after some major setbacks and big costs <a href=\"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/progress\/big-progress-for-new-sewage-pipe-project-in-heartland-america-park-ketv-omaha.php\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"limit_modified_date":"","last_modified_date":"","_lmt_disableupdate":"","_lmt_disable":"","footnotes":""},"categories":[431575],"tags":[],"class_list":["post-232897","post","type-post","status-publish","format-standard","hentry","category-progress"],"modified_by":null,"_links":{"self":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/232897"}],"collection":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/comments?post=232897"}],"version-history":[{"count":0,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/232897\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/media?parent=232897"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/categories?post=232897"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/tags?post=232897"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}