{"id":231951,"date":"2017-08-02T08:24:48","date_gmt":"2017-08-02T12:24:48","guid":{"rendered":"http:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/uncategorized\/bwxt-nuclear-energy-canada-awarded-ca34-million-contract-for-primary-heat-transport-motors-business-wire-press-release.php"},"modified":"2017-08-02T08:24:48","modified_gmt":"2017-08-02T12:24:48","slug":"bwxt-nuclear-energy-canada-awarded-ca34-million-contract-for-primary-heat-transport-motors-business-wire-press-release","status":"publish","type":"post","link":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/life-extension\/bwxt-nuclear-energy-canada-awarded-ca34-million-contract-for-primary-heat-transport-motors-business-wire-press-release.php","title":{"rendered":"BWXT Nuclear Energy Canada Awarded CA$34 Million Contract for Primary Heat Transport Motors &#8211; Business Wire (press release)"},"content":{"rendered":"<p><p>    PETERBOROUGH, Ontario--(BUSINESS    WIRE)--BWX Technologies, Inc. (NYSE: BWXT)    announced today that its subsidiary BWXT Nuclear Energy Canada    Inc. (BWXT NEC) has been awarded a CA$34 million, five year    contract to supply seven primary heat transport motors for    Bruce Power. The motors are part of Bruce Powers    life-extension program that will extend the life of six of its    reactors to continue providing Ontario with clean, low-cost and    reliable electricity for decades to come.  <\/p>\n<p>    The primary heat transport motors are required to drive the    main circulating pumps used to push heavy water through the    reactor core into the steam generators. The scope of the    contract includes the project management, engineering and    manufacturing of seven 11,000 horsepower motors. Work under    this contract will commence immediately with the first motor    scheduled to be delivered to Bruce Power in mid-2018.  <\/p>\n<p>    We appreciate the opportunity to execute this important    project for Bruce Power and take great pride in our    contributions to its life extension program, said John    MacQuarrie, president of BWXT Canada Ltd. and BWXT NEC. BWXT    is pleased to be in a position to supply its customers with a    multitude of product and service solutions to assist them in    extending the lives of their nuclear plants.  <\/p>\n<p>    Partnering with BWXT for this important motor work is critical    to ensuring the life extension and operation through 2064,    said Mike Rencheck, Bruce Powers president and CEO. Planning    and preparation is key to our continued on-time and on-budget    performance since January 2016 when our life extension program    was started. Suppliers like BWXT and their performance are    critical to our success; its a team effort.  <\/p>\n<p>    Nuclear energy plays a significant role to Ontarios economy    and it is great to see the positive effects of Bruce Powers    life extension project being felt right here in Peterborough,    said Jeff Leal, Member of Provincial Parliament. Throughout    its program to extend the life of six of its reactors, Bruce    Power will inject billions into Ontarios economy and generate    thousands of jobs.  <\/p>\n<p>    Bruce Power supplies 30% of Ontarios electricity at 30% less    than the average cost to generate residential power. Extending    the operational life of the Bruce Power units to 2064 will    create and sustain 22,000 direct and indirect jobs every year,    create $4 billion in annual Ontario economic benefit, and will    ensure low-cost, clean and reliable energy for Ontario families    and businesses.  <\/p>\n<p>    Forward Looking Statements  <\/p>\n<p>    BWXT cautions that this release contains forward-looking    statements, including statements relating to the performance,    timing and value, to the extent contract value can be viewed as    an indicator of future revenues, of the Bruce Power contract.    These forward-looking statements involve a number of risks and    uncertainties, including, among other things, modification or    termination of the contract and delays. If one or more    of these or other risks materialize, actual results may vary    materially from those expressed. For a more complete discussion    of these and other risk factors, please see BWXTs annual    report on Form 10-K for the year ended December 31, 2016 and    subsequent quarterly reports on Form 10-Q filed with the    Securities and Exchange Commission. BWXT cautions not to place    undue reliance on these forward-looking statements, which speak    only as of the date of this release, and undertakes no    obligation to update or revise any forward-looking statement,    except to the extent required by applicable law.  <\/p>\n<p>    About BWXT Nuclear Energy Canada Inc.  <\/p>\n<p>    BWXT Nuclear Energy Canada Inc. (BWXT NEC), a subsidiary of    BWXT Canada Ltd., has more than 60 years of extensive    experience and innovation in the supply of nuclear fuel and    fuel channel components, services, equipment and parts for the    CANDU nuclear power industry. This includes designing and    supplying highly reliable nuclear equipment to fuel, inspect    and refurbish reactors. BWXT NEC employs approximately 350    skilled employees at three locations in Ontario: Peterborough,    Toronto and Arnprior. Learn more at <a href=\"http:\/\/www.nec.bwxt.com\" rel=\"nofollow\">http:\/\/www.nec.bwxt.com<\/a>.  <\/p>\n<p>    About Bruce Power  <\/p>\n<p>    Formed in 2001, Bruce Power is an electricity company based    in Bruce County, Ontario. We are powered by our people. Our    4,200 employees are the foundation of our accomplishments and    are proud of the role they play in safely delivering clean,    reliable, low-cost nuclear power to families and businesses    across the province. Bruce Power has worked hard to build    strong roots in Ontario and is committed to protecting the    environment and supporting the communities in which we live.    Learn more at <a href=\"http:\/\/www.brucepower.com\" rel=\"nofollow\">http:\/\/www.brucepower.com<\/a> and follow us    on Facebook, Twitter, LinkedIn, Instagram and YouTube.  <\/p>\n<p><!-- Auto Generated --><\/p>\n<p>Read this article: <\/p>\n<p><a target=\"_blank\" rel=\"nofollow\" href=\"http:\/\/www.businesswire.com\/news\/home\/20170802005139\/en\/BWXT-Nuclear-Energy-Canada-Awarded-CA34-Million\" title=\"BWXT Nuclear Energy Canada Awarded CA$34 Million Contract for Primary Heat Transport Motors - Business Wire (press release)\">BWXT Nuclear Energy Canada Awarded CA$34 Million Contract for Primary Heat Transport Motors - Business Wire (press release)<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p> PETERBOROUGH, Ontario--(BUSINESS WIRE)--BWX Technologies, Inc. (NYSE: BWXT) announced today that its subsidiary BWXT Nuclear Energy Canada Inc. (BWXT NEC) has been awarded a CA$34 million, five year contract to supply seven primary heat transport motors for Bruce Power <a href=\"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/life-extension\/bwxt-nuclear-energy-canada-awarded-ca34-million-contract-for-primary-heat-transport-motors-business-wire-press-release.php\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"limit_modified_date":"","last_modified_date":"","_lmt_disableupdate":"","_lmt_disable":"","footnotes":""},"categories":[431585],"tags":[],"class_list":["post-231951","post","type-post","status-publish","format-standard","hentry","category-life-extension"],"modified_by":null,"_links":{"self":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/231951"}],"collection":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/comments?post=231951"}],"version-history":[{"count":0,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/231951\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/media?parent=231951"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/categories?post=231951"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/tags?post=231951"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}