{"id":231552,"date":"2017-08-01T06:51:47","date_gmt":"2017-08-01T10:51:47","guid":{"rendered":"http:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/uncategorized\/bridges-linking-3-islands-a-go-says-neda-exec-inquirer-net.php"},"modified":"2017-08-01T06:51:47","modified_gmt":"2017-08-01T10:51:47","slug":"bridges-linking-3-islands-a-go-says-neda-exec-inquirer-net","status":"publish","type":"post","link":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/islands\/bridges-linking-3-islands-a-go-says-neda-exec-inquirer-net.php","title":{"rendered":"Bridges linking 3 islands a go, says Neda exec &#8211; Inquirer.net"},"content":{"rendered":"<p><p>      ILOILO CITY  The Duterte administration would surely      implement a project to connect three Visayan islands  Panay,      Negros and Guimaras  through a bridge network      estimated to cost at least P27 billion, according to the      National Economic and Development Authority (Neda).    <\/p>\n<p>      The bridge network was among three major projects for      implementation in Western Visayas, which would cost a total      of P77 billion, according to Ro-Ann Bacal, Neda Western      Visayas director.    <\/p>\n<p>      The other projects include the improvement of Iloilo      International Airport (estimated cost at P30 billion) and      Panay River Basin Integrated Development (estimated cost at      P19 billion).    <\/p>\n<p>      The detailed engineering study of the bridge project is      expected to be completed within the year.    <\/p>\n<p>      This will definitely push through, Bacal told the Inquirer.    <\/p>\n<p>      China and Japan expressed interest in funding the      project through the official development assistance.    <\/p>\n<p>      Funding details would be determined by the Department of      Finance, according to Bacal.    <\/p>\n<p>      P28 billion for 13.2 km    <\/p>\n<p>      Proposals to connect the three island through a bridge      network have been pushed since the administration of former      President and now Pampanga Rep. Gloria Macapagal-Arroyo.    <\/p>\n<p>      In a study by the Department of Public Works and Highways in      2010, the cost of the project was estimated to reach P28      billion covering 13.2 km.    <\/p>\n<p>      This included 3.6 km for Panay-Guimaras Bridge worth      P9.4 billion and a 9.56-km bridge to connect Guimaras and      Negros, costing P19 billion.    <\/p>\n<p>      Improve islands economy    <\/p>\n<p>      The bridge network is expected to improve the economy of the      three islands through faster and more efficient transport of      people and goods.    <\/p>\n<p>      Among the improvements at Iloilo International Airport in      Cabatuan town were rehabilitation of its terminal building      and baggage carousel.    <\/p>\n<p>      The Panay River Basin Integrated Development Project in Capiz      province involved the construction of a multipurpose dam      designed to stop perennial flooding and generate more      electricity.    <\/p>\n<p>      Bacal said road projects were also in the pipeline.    <\/p>\n<p>      The Duterte administration has launched an ambitious Build,      Build, Build infrastructure program to spur economic      development but concerns were raised that this would push the      country deeper in debt.    <\/p>\n<p>      But Budget Secretary Benjamin Diokno said the concerns were      unwarranted.    <\/p>\n<p>      Economic conditions have changed for the better and we have      learned from the mistakes of the past, Diokno said in a      previous report.    <\/p>\n<p>      He said prevailing economic conditions were different from      that which had led to the economic crisis that gripped the      country during the Marcos dictatorship.    <\/p>\n<p>      We will finance the bold infrastructure program through a      combination of taxes, nontax revenues, borrowingsboth      external and domestic, Diokno said.    <\/p>\n<p>    Subscribe to INQUIRER PLUS to get access    to The Philippine Daily Inquirer & other 70+ titles, share    up to 5 gadgets, listen to the news, download as early as 4am    & share articles on social media. Call 896 6000.  <\/p>\n<p><!-- Auto Generated --><\/p>\n<p>More here: <\/p>\n<p><a target=\"_blank\" href=\"http:\/\/newsinfo.inquirer.net\/919220\/bridges-linking-3-islands-a-go-says-neda-exec\" title=\"Bridges linking 3 islands a go, says Neda exec - Inquirer.net\">Bridges linking 3 islands a go, says Neda exec - Inquirer.net<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p> ILOILO CITY The Duterte administration would surely implement a project to connect three Visayan islands Panay, Negros and Guimaras through a bridge network estimated to cost at least P27 billion, according to the National Economic and Development Authority (Neda). The bridge network was among three major projects for implementation in Western Visayas, which would cost a total of P77 billion, according to Ro-Ann Bacal, Neda Western Visayas director <a href=\"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/islands\/bridges-linking-3-islands-a-go-says-neda-exec-inquirer-net.php\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"limit_modified_date":"","last_modified_date":"","_lmt_disableupdate":"","_lmt_disable":"","footnotes":""},"categories":[38],"tags":[],"class_list":["post-231552","post","type-post","status-publish","format-standard","hentry","category-islands"],"modified_by":null,"_links":{"self":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/231552"}],"collection":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/comments?post=231552"}],"version-history":[{"count":0,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/231552\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/media?parent=231552"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/categories?post=231552"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/tags?post=231552"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}