{"id":220158,"date":"2017-06-16T23:44:01","date_gmt":"2017-06-17T03:44:01","guid":{"rendered":"http:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/uncategorized\/cu-boulder-to-build-new-82-5-million-aerospace-building-on-campus-the-denver-channel.php"},"modified":"2017-06-16T23:44:01","modified_gmt":"2017-06-17T03:44:01","slug":"cu-boulder-to-build-new-82-5-million-aerospace-building-on-campus-the-denver-channel","status":"publish","type":"post","link":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/aerospace\/cu-boulder-to-build-new-82-5-million-aerospace-building-on-campus-the-denver-channel.php","title":{"rendered":"CU Boulder to build new $82.5 million aerospace building on campus &#8211; The Denver Channel"},"content":{"rendered":"<p><p>    BOULDER, Colo.  The University of Colorado Board of Regents    has approved plans to build a new $82.5 million aerospace    engineering building on the CU Boulder campus.  <\/p>\n<p>    The 139,000-square-foot facility will offer a state-of-the-art    learning environment for students in the Ann and H.J. Smead    Department of Aerospace Engineering Sciences.  <\/p>\n<p>    In addition to a 200-seat auditorium, offices and other    classroom space, the new building will include an indoor flight    environment for testing unmanned craft and it will be built    with a roof design that allows for the sight lines needed to    track satellites in orbit.  <\/p>\n<p>    The building will be located along Discovery Drive, between the    existing Sustainability, Energy and Environment Complex and the    Laboratory for Atmospheric and Space Physics Space Science    Building on CU Boulders East Campus.  <\/p>\n<p>    CU Boulders aerospace program has seen a lot of growth in    recent years  enrollment grew from 647 students in the fall of    2011 to 946 in fall 2016  and this new building will help the    university keep its momentum going.  <\/p>\n<p>    This is a watershed moment, not just for CU aerospace, but for    our entire college, the university and the state of Colorado,    said Bobby Braun, dean of engineering. CU Boulder is already    recognized as a national leader in aerospace, and this    state-of-the-art facility will take us to the next level. This    facility will be a beacon of innovation for the students,    researchers and industries of the future.  <\/p>\n<p>    Fundraising for the building is already underway and a $15    million gift earlier this year puts the university well on its    way toward its goal.  <\/p>\n<p>    Construction on the new facility is expected to begin in the    fall, with an anticipated completion date in July 2019.  <\/p>\n<p><!-- Auto Generated --><\/p>\n<p>See the article here:<\/p>\n<p><a target=\"_blank\" href=\"http:\/\/www.thedenverchannel.com\/news\/local-news\/cu-boulder-to-build-new-825-million-aerospace-building-on-campus\" title=\"CU Boulder to build new $82.5 million aerospace building on campus - The Denver Channel\">CU Boulder to build new $82.5 million aerospace building on campus - The Denver Channel<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p> BOULDER, Colo. The University of Colorado Board of Regents has approved plans to build a new $82.5 million aerospace engineering building on the CU Boulder campus <a href=\"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/aerospace\/cu-boulder-to-build-new-82-5-million-aerospace-building-on-campus-the-denver-channel.php\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"limit_modified_date":"","last_modified_date":"","_lmt_disableupdate":"","_lmt_disable":"","footnotes":""},"categories":[19],"tags":[],"class_list":["post-220158","post","type-post","status-publish","format-standard","hentry","category-aerospace"],"modified_by":null,"_links":{"self":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/220158"}],"collection":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/comments?post=220158"}],"version-history":[{"count":0,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/220158\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/media?parent=220158"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/categories?post=220158"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/tags?post=220158"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}