{"id":209709,"date":"2017-02-20T14:57:52","date_gmt":"2017-02-20T19:57:52","guid":{"rendered":"http:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/uncategorized\/jdr-wins-us-offshore-wind-farm-work-oe-digital.php"},"modified":"2017-02-20T14:57:52","modified_gmt":"2017-02-20T19:57:52","slug":"jdr-wins-us-offshore-wind-farm-work-oe-digital","status":"publish","type":"post","link":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/offshore\/jdr-wins-us-offshore-wind-farm-work-oe-digital.php","title":{"rendered":"JDR wins US offshore wind farm work &#8211; OE Digital"},"content":{"rendered":"<p><p>    Subsea power cables and umbilical manufacturer JDR has been    selected by US Wind Inc., as the preferred cable partner for    its first offshore wind project.  <\/p>\n<p>    The project is the 750MW Maryland Development project. Expected    to be the largest offshore wind farm to date in the USA, the    Maryland Development project will include a maximum of 187    turbines in up to 30m water depth, and will be 24km (15mi) off    the coast. The project is subject to offshore renewable energy    credit in 2017 and final investment decision in 2018. JDR will    supply and install both inter-array and export cables.  <\/p>\n<p>      JDRs scope of supply for the Maryland Development Project      includes project management, engineering and manufacture of      196km (122mi) of inter-array cable, 180km (112mi) of export      cable (split into three lengths) and cable accessories. Cable      installation for both inter-array, export cables and      termination and testing of both cable types will also be      provided by JDR. Cable manufacture is expected to commence in      2018 with delivery and installation in 2019 and 2020.      Engineering works will begin in 2017. The contract is worth      more than US$275 million.    <\/p>\n<p>    The USA is a growing market opportunity and of strategic    importance for the offshore renewable industry. This contract    award demonstrates customer confidence in JDR as the leading    cable partner of choice, says JDR CEO, David Currie.  <\/p>\n<p>    To support the project, JDR will establish a storage and    mobilization facility in Maryland. The company will also open a    project management and engineering office base.  <\/p>\n<p>    Paul Rich, Director of Project Development for US Wind Inc.    says: US Wind is proud to be a local, Maryland-based company    bringing a new industry to the state along with thousands of    manufacturing jobs for generations, as we establish the hub for    offshore wind manufacturing for the entire east coast of the    US.\"  <\/p>\n<\/p>\n<p><!-- Auto Generated --><\/p>\n<p>Link: <\/p>\n<p><a target=\"_blank\" rel=\"nofollow\" href=\"http:\/\/www.oedigital.com\/component\/k2\/item\/14730-jdr-wins-us-offshore-wind-farm-work\" title=\"JDR wins US offshore wind farm work - OE Digital\">JDR wins US offshore wind farm work - OE Digital<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p> Subsea power cables and umbilical manufacturer JDR has been selected by US Wind Inc., as the preferred cable partner for its first offshore wind project. The project is the 750MW Maryland Development project.  <a href=\"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/offshore\/jdr-wins-us-offshore-wind-farm-work-oe-digital.php\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"limit_modified_date":"","last_modified_date":"","_lmt_disableupdate":"","_lmt_disable":"","footnotes":""},"categories":[431655],"tags":[],"class_list":["post-209709","post","type-post","status-publish","format-standard","hentry","category-offshore"],"modified_by":null,"_links":{"self":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/209709"}],"collection":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/comments?post=209709"}],"version-history":[{"count":0,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/209709\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/media?parent=209709"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/categories?post=209709"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/tags?post=209709"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}