{"id":206984,"date":"2017-02-10T21:58:44","date_gmt":"2017-02-11T02:58:44","guid":{"rendered":"http:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/uncategorized\/eni-starts-production-of-east-hub-development-project-offshore-angola-offshore-technology.php"},"modified":"2017-02-10T21:58:44","modified_gmt":"2017-02-11T02:58:44","slug":"eni-starts-production-of-east-hub-development-project-offshore-angola-offshore-technology","status":"publish","type":"post","link":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/offshore\/eni-starts-production-of-east-hub-development-project-offshore-angola-offshore-technology.php","title":{"rendered":"Eni starts production of East Hub Development Project, offshore Angola &#8211; Offshore Technology"},"content":{"rendered":"<p><p>    Eni has started production of the East Hub Development Project    in Block 15\/06 of the Angolan deep offshore region, five months    ahead of schedule.  <\/p>\n<p>    The oilcompany is using the Armada Olombendo Floating    Production Storage and Offloading (FPSO) vessel for production    which can generate up to 80,000bpd of oiland compress up    to 3.4 million cubic metres of gasa day.  <\/p>\n<p>    FPSO Olombendo will put Cabaa South East field into production    with nine wells and four manifolds at adepth of 450m.  <\/p>\n<p>    The Cabaa South East field is located about 350km from Luanda    and 130km west of Soyo.  <\/p>\n<p>    East Hub Project production will add to the output from the    existing West Hub Project in the Sangos, Cinguvu and Mpungi    fields, where another vessel, FPSO NGoma, is operating.  <\/p>\n<p>    Overall, Block 15\/06is expected to reacha peak of    150,000bpd this year.  <\/p>\n<p>    Eni CEO Claudio Descalzi said: We are proud of what we have    achieved in Block 15\/06. Leveraging our extensive experience in    exploration, we have been able to discover a total    ofthree billion barrels of oil in place throughten    commercial discoveries.  <\/p>\n<p>    \"We have been able to discover a total of three billion barrels    of oil in place through ten commercial discoveries.\"  <\/p>\n<p>    Moreover, thanks to strong field development and project    management, we are beginning production of the East Hub with a    time-to-market of onlythree years, andfive months    ahead of schedule.  <\/p>\n<p>    Cabaa South East brings our number of fields in production to    five, withtwo more expected to start before the end of    2018.  <\/p>\n<p>    This is yet another example of Enis Angolan and worldwide    capability to deliver state-of-the-art projects, and was made    possible by Enis new operational model, where we play an    increasingly active role in the integrated development of our    projects.  <\/p>\n<p>    Eni operates Block 15\/06 with 36.84% stake. Sonangol Pesquisa e    Produo and SSI Fifteen Limited hold the remaining ownership    with interests of36.84% and 26.32%respectively.  <\/p>\n<p>    Eni has been operating in Angola since 1980 through its    subsidiary.  <\/p>\n<p><!-- Auto Generated --><\/p>\n<p>Read more: <\/p>\n<p><a target=\"_blank\" rel=\"nofollow\" href=\"http:\/\/www.offshore-technology.com\/news\/newseni-starts-production-at-east-hub-development-project-offshore-angola-5736346\" title=\"Eni starts production of East Hub Development Project, offshore Angola - Offshore Technology\">Eni starts production of East Hub Development Project, offshore Angola - Offshore Technology<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p> Eni has started production of the East Hub Development Project in Block 15\/06 of the Angolan deep offshore region, five months ahead of schedule. The oilcompany is using the Armada Olombendo Floating Production Storage and Offloading (FPSO) vessel for production which can generate up to 80,000bpd of oiland compress up to 3.4 million cubic metres of gasa day. FPSO Olombendo will put Cabaa South East field into production with nine wells and four manifolds at adepth of 450m <a href=\"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/offshore\/eni-starts-production-of-east-hub-development-project-offshore-angola-offshore-technology.php\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"limit_modified_date":"","last_modified_date":"","_lmt_disableupdate":"","_lmt_disable":"","footnotes":""},"categories":[431655],"tags":[],"class_list":["post-206984","post","type-post","status-publish","format-standard","hentry","category-offshore"],"modified_by":null,"_links":{"self":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/206984"}],"collection":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/comments?post=206984"}],"version-history":[{"count":0,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/206984\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/media?parent=206984"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/categories?post=206984"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/tags?post=206984"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}