{"id":162867,"date":"2014-11-30T09:42:02","date_gmt":"2014-11-30T14:42:02","guid":{"rendered":"http:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/uncategorized\/extra-1-2m-funding-means-scheme-to-save-pooles-beaches-can-be-extended.php"},"modified":"2014-11-30T09:42:02","modified_gmt":"2014-11-30T14:42:02","slug":"extra-1-2m-funding-means-scheme-to-save-pooles-beaches-can-be-extended","status":"publish","type":"post","link":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/beaches\/extra-1-2m-funding-means-scheme-to-save-pooles-beaches-can-be-extended.php","title":{"rendered":"Extra 1.2m funding means scheme to save Pooles beaches can be extended"},"content":{"rendered":"<p><p>    A BUMPER 1.2million of additional government funding has meant    storm repairs pumping sand onto Pooles seafront can be    extended.  <\/p>\n<p>    Sand is being added to Shore Road beach to protect residential    properties and infrastructure from coastal erosion and now the    scheme can continue towards Branksome Beach and the Bournemouth    border.  <\/p>\n<p>    The last large scale sand replenishment took place in 2005\/6    and the next scheme to build Pooles beaches back up to their    previous levels was due to take place in 2016\/17, but the    funding means it can happen now.  <\/p>\n<p>    During last winters storms, Shore Road in particular lost a    significant amount of sand, approximately 10 years worth of    erosion occurred in just a couple of months.  <\/p>\n<p>    Defra awarded Poole 750,000 of funding to pump 40,000 cubic    metres of recycled sand onto the beach, which began over a week    ago. This was due to finish by the end of November but will now    continue until Christmas.  <\/p>\n<p>    Poole Harbour Commissioners are supplying    the sand from routine dredging of the Swash Channel, with a    dredger connecting to the pipeline where the sand is pumped    ashore.  <\/p>\n<p>    We are delighted with the opportunity from Defra to bring    forward our major beach replenishment scheme and add it to this    current project to repair the damage from recent storms, said    Cllr Xena Dion, cabinet portfolio holder for flood and coastal    management, Borough of Poole.  <\/p>\n<p>    By working with Defra and Poole Harbour Commissioners we    estimate to save around 300,000, as we already have the    dredger, pipeline and heavy plant in place.  <\/p>\n<p>    While small sections of the beach are closed where the sand is    being pumped, the promenade remains open. We welcome people    coming to watch this engineering project which is quite    spectacular.  <\/p>\n<p>    We appreciate everyones patience while the work is carried    out, as it is vital to ensure the beach infrastructure and    properties are protected for this winter and for many years to    come, she said.  <\/p>\n<p><!-- Auto Generated --><\/p>\n<p>See the rest here:<\/p>\n<p><a target=\"_blank\" href=\"http:\/\/www.bournemouthecho.co.uk\/NEWS\/11634059.Extra___1_2m_funding_means_scheme_to_save_Poole___s_beaches_can_be_extended\/?ref=rss\/RK=0\/RS=2Hj7hno7QnL1mWJzLFU0KiU2qWY-\" title=\"Extra 1.2m funding means scheme to save Pooles beaches can be extended\">Extra 1.2m funding means scheme to save Pooles beaches can be extended<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p> A BUMPER 1.2million of additional government funding has meant storm repairs pumping sand onto Pooles seafront can be extended. Sand is being added to Shore Road beach to protect residential properties and infrastructure from coastal erosion and now the scheme can continue towards Branksome Beach and the Bournemouth border.  <a href=\"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/beaches\/extra-1-2m-funding-means-scheme-to-save-pooles-beaches-can-be-extended.php\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"limit_modified_date":"","last_modified_date":"","_lmt_disableupdate":"","_lmt_disable":"","footnotes":""},"categories":[39],"tags":[],"class_list":["post-162867","post","type-post","status-publish","format-standard","hentry","category-beaches"],"modified_by":null,"_links":{"self":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/162867"}],"collection":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/comments?post=162867"}],"version-history":[{"count":0,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/162867\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/media?parent=162867"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/categories?post=162867"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/tags?post=162867"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}