{"id":151574,"date":"2014-10-17T18:48:06","date_gmt":"2014-10-17T22:48:06","guid":{"rendered":"http:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/uncategorized\/lpciminelli-awarded-phase-2-contract-for-construction-of-new-medical-school.php"},"modified":"2014-10-17T18:48:06","modified_gmt":"2014-10-17T22:48:06","slug":"lpciminelli-awarded-phase-2-contract-for-construction-of-new-medical-school","status":"publish","type":"post","link":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/medical-school\/lpciminelli-awarded-phase-2-contract-for-construction-of-new-medical-school.php","title":{"rendered":"LPCiminelli awarded phase 2 contract for construction of new medical school"},"content":{"rendered":"<p><p>    The SUNY Construction Fund has awarded LPCiminelli the bid for    the second phase of construction for UBs new School of    Medicine and Biomedical Sciences building on the Buffalo    Niagara Medical Campus.  <\/p>\n<p>    The contract for phase 2  the largest by far of three    construction phases  is worth approximately $226 million.    LPCiminelli was the lowest bidder among three.  <\/p>\n<p>    At 650,000 square feet, the $375-million project at Main and    High streets is the largest medical education building under    construction in the nation. When the new building opens in    2017, it is expected to house 2,000 faculty, students and staff    from the School of Medicine and Biomedical Sciences.  <\/p>\n<p>    The design includes a seven-story atrium, classrooms and    laboratories. It will be constructed on top of a new    Allen\/Hospital Metro station, a feature that accentuates    community connections and promotes sustainable transportation    options. The building is on track to be certified LEED    (Leadership in Energy and Environmental Design) Gold,    demonstrating UBs commitment to environmental and energy    stewardship.  <\/p>\n<p>    Class size within the medical school will increase from 140 to    180 students. UB also is recruiting 100 new faculty members     world-class physician scientists and medical specialists  to    teach within the school. The new faculty will bring much-needed    clinical specialties to the region, as well as training    programs in important, new medical fields.  <\/p>\n<p>    Next steps in construction  <\/p>\n<p>    Work on phase 2 is expected to begin in the spring. It involves    construction of the buildings faade and roof; completion of    all plumbing, mechanical and electrical systems; and completion    of all interior finishes.  <\/p>\n<p>    The next major visible signs of construction progress will    include the erection of a tower crane about 280 feet in height    in December, around the time the buildings structural steel    will begin to go up.  <\/p>\n<p>    Phase 2 work is expected to continue until the completion of    the building in early 2017. Some of the furniture and equipment    will be moved into the building in fall 2016 in phase 3 of the    project.  <\/p>\n<p>    Medical students will begin attending classes and labs in the    new building during spring 2017. The expectation is that all UB    medical students will be in the new building by August 2017.  <\/p>\n<p><!-- Auto Generated --><\/p>\n<p>Read the original: <\/p>\n<p><a target=\"_blank\" href=\"http:\/\/www.buffalo.edu\/ubreporter\/campus\/campus-host-page.host.html\/content\/shared\/university\/news\/ub-reporter-articles\/stories\/2014\/October\/phase2_med_school.detail.html\/RK=0\/RS=ERlzOF9CMhl.uXLKV29F3QdGkQE-\" title=\"LPCiminelli awarded phase 2 contract for construction of new medical school\">LPCiminelli awarded phase 2 contract for construction of new medical school<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p> The SUNY Construction Fund has awarded LPCiminelli the bid for the second phase of construction for UBs new School of Medicine and Biomedical Sciences building on the Buffalo Niagara Medical Campus. The contract for phase 2 the largest by far of three construction phases is worth approximately $226 million. LPCiminelli was the lowest bidder among three <a href=\"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/medical-school\/lpciminelli-awarded-phase-2-contract-for-construction-of-new-medical-school.php\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"limit_modified_date":"","last_modified_date":"","_lmt_disableupdate":"","_lmt_disable":"","footnotes":""},"categories":[36],"tags":[],"class_list":["post-151574","post","type-post","status-publish","format-standard","hentry","category-medical-school"],"modified_by":null,"_links":{"self":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/151574"}],"collection":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/comments?post=151574"}],"version-history":[{"count":0,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/151574\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/media?parent=151574"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/categories?post=151574"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/tags?post=151574"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}