{"id":116671,"date":"2014-03-15T07:52:26","date_gmt":"2014-03-15T11:52:26","guid":{"rendered":"http:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/uncategorized\/nasa-awards-bridge-contract-for-flight-dynamics-support-services.php"},"modified":"2014-03-15T07:52:26","modified_gmt":"2014-03-15T11:52:26","slug":"nasa-awards-bridge-contract-for-flight-dynamics-support-services","status":"publish","type":"post","link":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/nasa\/nasa-awards-bridge-contract-for-flight-dynamics-support-services.php","title":{"rendered":"NASA Awards Bridge Contract For Flight Dynamics Support Services"},"content":{"rendered":"<p><p>    NASA has awarded the Flight Dynamics Support Services (FDSS)    Bridge contract for engineering services to a.i. solutions    Inc.,Lanham,    Md.This contract is necessary to continue    performance at NASA's Goddard Space Flight Center    inGreenbelt,    Md.until the Flight Dynamics Support Services II    contract is awarded.  <\/p>\n<p>    The cost-plus-fixed-fee, indefinite delivery\/indefinite    quantity basic contract has a minimum ordering value    of$500,000and a maximum    ordering value of$20    millionwith a period of performance    fromMarch 14 through March 13,    2015. There is also an option to extend the period of    performance fromMarch 14,    2015, throughJune 13,    2015, with a maximum ordering value of$5.4 million.  <\/p>\n<p>    The contractor will continue to provide flight dynamics and    attitude control operations engineering support and analysis    and related work to the Mission Engineering and Systems    Analysis Division's Navigation and Mission Design Branch and    Attitude Control Systems Engineering Branch, including the    Flight Dynamics Facility, and related organizations, as    required, for both in-house and out-of-house spacecraft    programs.  <\/p>\n<p>    Task orders issued under the FDSS Bridge contract provide    critical support to a wide range of NASA's missions and    projects including: James Webb Space Telescope, the    Magnetosphere Multi-scale Mission, the Global Precipitation    Measurement (GPM) mission, the Geostationary Operational    Environmental Satellites, Deep Space Climate Observatory and    the Mars Atmosphere Volatile Evolution (MAVEN).  <\/p>\n<p>    For information about NASA and agency programs, visit:  <\/p>\n<blockquote class=\"wp-embedded-content\" data-secret=\"Jmeu6LBSUb\"><p><a href=\"https:\/\/www.nasa.gov\/\">Home Page<\/a><\/p><\/blockquote>\n<p><iframe loading=\"lazy\" class=\"wp-embedded-content\" sandbox=\"allow-scripts\" security=\"restricted\" style=\"position: absolute; visibility: hidden;\" title=\"&#8220;Home Page&#8221; &#8212; NASA\" src=\"https:\/\/www.nasa.gov\/embed\/#?secret=43buMN85sk#?secret=Jmeu6LBSUb\" data-secret=\"Jmeu6LBSUb\" width=\"584\" height=\"329\" frameborder=\"0\" marginwidth=\"0\" marginheight=\"0\" scrolling=\"no\"><\/iframe>  <\/p>\n<\/p>\n<p>    Please follow SpaceRef on Twitter and Like us on    Facebook.  <\/p>\n<p><!-- Auto Generated --><\/p>\n<p>See the rest here: <\/p>\n<p><a target=\"_blank\" href=\"http:\/\/spaceref.com\/news\/viewpr.html?pid=42786\/RK=0\/RS=4MCsGB3FeAvzJlyMBkER13mq15o-\" title=\"NASA Awards Bridge Contract For Flight Dynamics Support Services\">NASA Awards Bridge Contract For Flight Dynamics Support Services<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p> NASA has awarded the Flight Dynamics Support Services (FDSS) Bridge contract for engineering services to a.i. solutions Inc.,Lanham, Md.This contract is necessary to continue performance at NASA's Goddard Space Flight Center inGreenbelt, Md.until the Flight Dynamics Support Services II contract is awarded. The cost-plus-fixed-fee, indefinite delivery\/indefinite quantity basic contract has a minimum ordering value of$500,000and a maximum ordering value of$20 millionwith a period of performance fromMarch 14 through March 13, 2015.  <a href=\"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/nasa\/nasa-awards-bridge-contract-for-flight-dynamics-support-services.php\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"limit_modified_date":"","last_modified_date":"","_lmt_disableupdate":"","_lmt_disable":"","footnotes":""},"categories":[20],"tags":[],"class_list":["post-116671","post","type-post","status-publish","format-standard","hentry","category-nasa"],"modified_by":null,"_links":{"self":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/116671"}],"collection":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/comments?post=116671"}],"version-history":[{"count":0,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/posts\/116671\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/media?parent=116671"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/categories?post=116671"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.euvolution.com\/futurist-transhuman-news-blog\/wp-json\/wp\/v2\/tags?post=116671"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}